1. The Subject Of The Order Is The Implementation Of A Video Monitoring System On The Premises Of The Municipal Selective Municipal Waste Collection Point Gpszok, Located At Ul. Brukowa 2 E In Łomianki. 2. Monitoring Must Meet The Requirements Of The Regulation Of The Minister Of The Environment Of August 29, 2019 On A Visual System For Monitoring Waste Storage Or Disposal Sites.3. The Scope Of Work Necessary To Be Performed By The Contractor Includes In Particular: 1) Dismantling Of Old Monitoring System Devices; 2) Delivery, Installation On Existing Poles, Commissioning And Configuration Of 19 Network Stationary Turret Cameras, Along With Dedicated Mounts And Installation Boxes; 3) Delivery, Installation In The Guard Room, Commissioning And Configuration Of 1 Network Stationary Turret Camera, Together With A Dedicated Installation Box; 4) Delivery, Installation In The Central Box, Commissioning And Configuration Of 1 Industrial-Class Network Switch; 5) Delivery, Installation In The Central Box And Commissioning Of The Power Supply For The Network Switch From Point 5 Industrial Class;6) Delivery, Installation In Auxiliary Boxes And Commissioning Of 3 Industrial-Class Network Switches;7) Delivery, Installation In The Central Box And Commissioning Of 3 Power Supplies For Network Switches From Point 7 Industrial Class;8) Delivery, Installation Of A Central Installation Box;9) Delivery, Installation Of Two Auxiliary Installation Boxes With A Foundation;10) Delivery, Installation And Commissioning Of The Equipment Powering Installation In Three Installation Boxes And Equipping Them With Overcurrent And Surge Protection, Power Sockets, Etc.;11) Construction Of A Fiber Optic Network Inside The Facility Between Three Installation Cabinets. Laying Two Sections Of Sm 2J Fiber Optic Cable, Between Central Box And Two Auxiliary Boxes, 200 M Long (Length Given Is An Estimate). The Cabling Should Be Laid In Opto Pipes; 12) Building A Network Based On A Copper Cable Inside The Facility Between Three Installation Boxes And Cameras And Network Devices. Laying 21 Sections Of Twisted-Pair Cable Between Network Switches And Cameras On 700 M Long Poles (The Length Is An Estimate). The Cabling Between The Boxes And The Poles Should Be Laid In Opto Pipes; 13) Construction Of A Power Line Between The Switchgear And Three Installation Boxes. Laying 3 Sections Of 200 M Long Power Cable (Length Given Is An Estimate); 14) Delivery, Installation In The Central Box, Commissioning And Configuration Of The Ups Emergency Power Supply With A Battery Module, With The Power To Maintain The Operation Of The Entire System For The Time Specified In The Act, I.E. Min. 2 Hours;15) Delivery, Installation And Commissioning Of The Required Number Of Sfp, Sm, Wdm, Ddm Fiber Optic Inserts, With Technical Parameters Ensuring Signal Transmission With A Throughput Of Min. 1 Gb/S;16) Delivery, Installation In The Guardhouse, Commissioning And Configuration Of 1 Monitor, Along With Dedicated Bra
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.