Gws 55 Wish To Appoint A Suitably Qualified Engineer With Experience In Civil Engineering Works And Construction Project Management In Water Distribution Systems For Group Water Schemes And Public Water Schemes Networks To Carry Out As Necessary An Assessment Of The Existing Watermain Infrastructure Of The Gws To Determine The Exact Scope Of Works Required To Bring The Scheme Up To The Minimum Basic Standard For Uisce Eireann Taking In Charge Consideration (As Per Uisce Eireann Basic Standards). Preparation And Submission Of The Full Taking In Charge Standard Documents On Behalf Of The Gws For Ue Taking In Charge Consideration, Including: • Application Form, • Submit Consent Form, • Connection Schedule, • As-Constructed Drawings • Wayleave Agreements
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.