Lot 1 - Mobilization And Demobilization (Travel Of Technicians And Equipment, Return And Assembly And Disassembly Of Equipment And Construction Site., Lot 1 - Execution Of Percussion Survey With Opening Of Access (Per Perforated Meter)., Lot 1 - Movement Between Percussion Points (Flat Terrain Up To 100 M) If The Terrain Is In An Accident And The Travel Distance Is Greater Than 50 M And Less Than 100 M, A Percentage Of 25% Will Be Added., Lot 1 - Technical Report Of The Survey Accompanied By Art, By Survey Carried Out, Lot 1 - Time Of The Team Idle Due To Action Taken By The Administration, Lot 1 - Geological Description Prepared, Formatted And Delivered In Accordance With The Technical Standards Published On The Subject, Mainly Those Coming From Abnt And Abge.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.