Construction Work – Connection Of The Klengbousbierg Z.A.C. To The N7 National Road In Bissen. Construction Of A Road With A Mixed Track On Both Sides Over A Length Of Approximately 690 M With Different Networks, Including A Bridge Made Up Of Two Spans Of A Mixed Steel-Concrete Structure, The Installation Of Retention Basins For Rainwater And The Creation Of A Retaining Wall In Contiguous Piles. Volume Of Work: Excavation: 14,000 M3; Lime Treatment: 11,000 M3; Road Body: 6,000 To; Coated: 3600 To; Various Network And Pipe Works: 8,000 M; Pile Works: 1000 Ml; Concrete: 800 M3; Metal Frame: 100 To; Frames: 112 To
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.