Tenders are invited for Rehabilitation of Water Network in Khyiam Village Delivery location Khyiam Village Contract start date 19 December 2025 Specific considerations A mandatory site visit will take place on 5 December 2025 SPECIFICATION OF GOODS and any SERVICES/ WORKS REQUIRED The main objective of this intervention is to replace approximately 900 meters of deteriorated HDPE pipeline with new high-quality HDPE pipes and to ensure complete reinstatement and safe operational performance of the water distribution system in Khyiam Village, Marjeyoun District. The contractor shall perform all works related to the full rehabilitation of the water distribution pipeline, including but not limited to: Controlled excavation Pipeline removal Supply and installation of new HDPE pipes 63 mm Installation of valves, fittings, and accessories Construction of RC manholes Backfilling and compaction Asphalt reinstatement Testing and commissioning Documentation and as-built drawings The objective is to deliver a fully functional, leak-free, safe, and durable water distribution network. 1. SITE MOBILIZATION Mobilization Requirements The contractor shall mobilize all necessary resources, including: Excavators, compactors, vibratory rollers Trucks for soil removal and material delivery Welding machines (butt-fusion & electrofusion) Surveying tools (levels, total station, tape measures) Temporary storage and secure material zones Safety equipment: PPE, barriers, traffic cones, steel plates, warning lights Site Preparations Contractor shall: Establish site boundaries and install protective fencing Prepare access routes for workers and machinery Allocate safe storage for pipes, fittings, and reinforcement Perform a full walk-through with the supervising engineer Identify existing underground utilities with SLWE and municipality. Prepare an emergency response and hazard mitigation plan Traffic & Public Safety Measures Install barriers, reflective tapes, metal plates at crossings Assign a traffic controller/flagman for busy roads Ensure 24-hour visibility of work zones with lights and signage The Contractor shall set out excavation lines and depths accurately before starting works. No construction activity may start before safety approval is granted from Oxfam engineer. How to apply A mandatory site visit will take place on 5 December 2025. Interested suppliers should send email to
[email protected]. With email subject strictly being Rehabilitation of Water Network in Khyiam Village. The time, and location of the visit will be shared later. Submission instructions- Please Refer to the ToR for the full details: Quotations and applications must reach Oxfam no later than 12 December 2025, midnight Lebanon time. Responses must be submitted in English, electronically or by hand to:
[email protected] Tender Link : https://www.daleel-madani.org/calls-for-proposal