GTR 105579249
Tenders Are Invited For Most Ev. No. 10543-1 Above The Railway In Milevsko
ICB — International Competitive Bid
Closed
Eastern Europe
Tender Information
GTR Reference
105579249
Tendering Authority
Subscribe to view
Tender No
VZ0234852
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Most Ev. No. 10543-1 Above The Railway In Milevsko
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
European Union
Last Date of Bid Submission
17-12-2025
Closed
Work Detail
Most Ev. No. 10543-1 Above The Railway In Milevsko. This Project Deals With The Demolition Of The Existing Bridge And No. 10543-1 And The Construction Of A New Bridge Over The Railway In Milevsko With Sufficient Clearance Under The Bridge For The Future Planned Electrification Of Regional Railways. Tábor-Písek Line. The Construction Site Is Located In The Town Of Milevska In The Milevsko Cadastral Area (694673), Písek District. The Bridge Is Located On Road Iii. Class No. 10543 Section Number 2224A039 2224A103, Stationing On The Section 1,750 Km, Line Stationing 1,750 Km. Road Iii/10543 Connects The Town Of Milevsko And The Village Of Sepekov. The Communication In Front Of And Behind The Bridge Is Conducted Approximately At The Level Of The Surrounding Terrain. The Stationing Of The Road Is Oriented In The Direction From The Center Of The City Of Milevska To The Village Of Sepekov, And This Project Is Also Developed In This Direction. This Is A Permanent Bridge Construction (So 201). As Part Of The Construction Of The Bridge, Permanent Network Rerouting Will Be Carried Out - Vo Rerouting (So 431), Čd-Telematika Communication Line Rerouting (So 451), Railway Administration Communication And Security Line Rerouting (So 452) And Cetin Communication Line Rerouting (So 451). Furthermore, A Permanent Sidewalk Connection Will Be Made (So 134). The Construction Object Of The Temporary Traffic Engineering Measure (So 181) Will Be Established Only For The Duration Of The Construction. So 451 Will Be Implemented In A Separate Contract Between Cetin And The Client. As Part Of So 431, The Push-Through Implemented By Cetin Will Be Used - More Cable Will Be Stretched, Which Is Priced In So 431. The Construction Implementation Must Be Coordinated With The Contractor So 451. During The Construction Implementation, It Is Necessary To Observe The Contracted And Non-Contractual Exclusion Dates Specified In The Draft Contract For The Work.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c6313dac-2c6e-4068-802d-587bf31e436c.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.