The Subject Of The Service For The 1St Ba Is The Complete Provision Of The Service Phases Lph 7 To 9 For The 1St Construction Phase In Accordance With Hoai §55 Service Profile Technical Equipment For System Group 4 Power Systems And System Group 5 Telecommunications And Information Technology Systems As Well As Conveyor Systems In Accordance With Hoai § 53 (Kgr 440, 450, 460 According To Din 276). The Basis Is The Completed Implementation Planning Of The Electrical Engineering Kgr 440/450/460 Including Development To Be Handed Over By The Client Or His Specialist Planner. This Implementation Planning Must Be Checked For Missing Or Incorrect Planning Content And Completed And Corrected Accordingly. Furthermore, The Contents Of The Test Reports Must Be Incorporated Into The Implementation Planning. If Or To The Extent That This Activity Results In A Need For Adjustments And/Or Changes To The Service Specifications That Have Already Been Produced, The Contractor Must Obtain Appropriate Supplementary Offers And Provide Any Planning Services Required For The Supplementary Offers. The Supplementary Inspection Is The Responsibility Of The Contractor. This Excludes Participation In The Awarding Of The Empty Pipe Insertion Work And The Grounding And Lightning Protection Work In The Shell Construction, Which Is Carried Out By The Shell Construction Trade. An Award Has Already Been Made Here And Installation Is Taking Place Parallel To This Award Process. The Remaining Service Lph5, Lph8 And Lph 9 For This Part Is Advertised As A Special Service. In Addition, The Partial Services From Lph5 Updating The Implementation Planning To The Status Of The Tender Results And The Then Existing Implementation Planning Of The Object Planning As Well As Checking And Acknowledging The Work And Assembly Plans Of The Executing Companies For Compliance With The Implementation Planning As Well As Various Special Services Such As Supplementing Planning Gaps Must Be Provided. Subject Of The Service For The 2Nd Ba According To Hoai §55 Performance Profile Of Technical Equipment For The System Group 4 Power Systems And System Group 5 Telecommunications And Information Technology Systems And Conveyor Systems According To Hoai § 53 (Kgr 440, 450, 460 According To Din 276): Creation Of A Draft Plan Corresponding To The State Of The Art, The Technical Standard Of The Uok As Well As The Technical Experience Including Adjustments From The 1St Ba Using The Lph 3 From 2018/Ew Construction 2022 Together With The Other Specialist Planners And Property Planning Involved In The Property.Lph4 To 9 For The 2Nd Construction Phase In Accordance With Hoai §55 Performance Profile Of Technical Equipment For The System Group 4 Power Systems And System Group 5 Telecommunications And Information Technology Systems And System Group 6 Conveyor Systems In Accordance With Hoai § 53 (Kgr 440, 450, 460 According To Din 276).The Basis Is The Draft Plan For Electrical Engineering Kgr 440/450/460 For The 2Nd Ba Created By The Client Or His Specialist Planner. The 2Nd Ba Is Independent Of The Electrical Supply (With The Exception Of The Emergency Power Supply Via The Emergency Diesel Of The 1St Ba) And Is Connected To The Nshv Of The Existing Building (Lecture Hall Building). The Connection To The Existing System With The Necessary Adjustments And The Connection To The Interface Of The 1St Ba Is The Subject Of The Contractors Service. In Addition, Various Special Services Must Be Provided In The Service Phases.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.