Quotation are invited for Construction Work at the Faya Slaughterhouse The work consists of constructing a slaughtering area measuring 24m x 12m, equipped with a 7m x 0.8m slaughtering table, a liquid waste drainage channel ending in a 2m x 3m x 2m pit, and a 1.5m x 1.5m x 1.5m reinforced concrete incinerator for solid waste. It also includes a 400m perimeter wall, a water tower with a 5m³ tank, and a 6m x 5m sanitary inspection area. The following infrastructure is to be built within the slaughtering area: - The main building, including the slaughtering area shed, an office, a store, a cold storage room, and a toilet; - Two latrine blocks; - A waste sump; - An incinerator; - 5m³ water tower; - 400m perimeter wall; - Inspection area The material specifications are as follows: 1. Logging shed with office Measuring 24m x 12m, the shed will include the following details: Excavations will be dug to a depth of 200cm to secure the 100mm I-beams; The 100mm I-beams will be set in concrete with a mix of 350kg/m³; The frame will consist of double angle metal trusses (70x70mmx7mm), with 50mm square tubing for the purlins; The roof will be made of corrugated metal sheets with hooks, including all necessary accessories; Construct a 110cm high concrete block wall around the perimeter of the shed, then pour a 10cm thick reinforced concrete slab with a mix of 350kg/m³; Construct a drainage channel of a specified length, made of concrete blocks with interior and exterior plastering and a 2% slope; Finally, construct three 2m x 2m IPN 80 steel frames and install 12mm steel hooks spaced 60cm apart on the frames. 2. Reinforced Concrete Tables Construction of two reinforced concrete tables, each measuring 7m x 0.6m and 1.30m high. The supports will be 15cm x 15cm and 1.20m high, made of reinforced concrete with a mix of 350kg/m³. The table thickness will be 10cm. HA 10 and HA 6 rebar will be used for reinforcement. 3. Construction of a 3m x 2m x 2m pit The pit will be excavated and constructed using 15cm concrete blocks with interior plastering; The posts will be 15cm x 15cm, the capping beam 10cm x 15cm, and two 1.5m x 1m x 0.08m reinforced concrete slabs (350kg/m³ mix) will be used to cover the entire length of the pipeline. 2. Foundations: Excavation: Excavations will be carried out according to the dimensions and depths specified in the construction drawings. Footings: The footings will be made of reinforced concrete (350kg/m³ mix), with dimensions adapted to the buildings structural loads. Foundation Wall: The foundation wall will be constructed of 20cm concrete blocks, with a height of 40cm above the natural ground level. The mortar for the joints will have a mix ratio of 300kg/m³. 3. Walls: Masonry: The walls will be constructed of 15cm concrete blocks, with a mortar mix ratio of 300kg/m³. Columns and Tie Beams: The columns and tie beams will be made of reinforced concrete with a mix ratio of 350kg/m³, with HA10 reinforcement for the columns and HA6 reinforcement for the stirrups. Render: The interior and exterior render will be applied with a cement mortar mix ratio of 300kg/m³, with a thickness of 2.5cm. 4. Roof: Framing: The roof structure will be a metal truss, composed of IPN80 beams as purlin supports and 50 mm square tubing as purlins, assembled with metal connectors. Roofing: The roof will be made of corrugated metal sheets, fixed to the framing with self-drilling screws. Insulation: Thermal insulation will be installed under the metal sheets to reduce heat inside the rooms. 5. Floors: Slab: The slab will be made of reinforced concrete with a mix of 350 kg/m³, with a thickness of 10 cm. A 5 cm thick finishing screed will be laid with a mortar mix of 300 kg/m³. Flooring: The floors of the rooms will be covered with non-slip ceramic tiles. 6. Doors and Windows: Doors: The doors will be metal, measuring 1.2 m x 2.10 m as indicated in the plans. [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.] Tender Link : https://www.iom.int/procurement-opportunities
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.