GTR 105406754

Tenders Are Invited For Kontion School (Part B) Repairs 2026-2027 Tate Design Tasks

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
105406754
Tendering Authority
Subscribe to view
Tender No
2025-034996
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Kontion School (Part B) Repairs 2026-2027 Tate Design Tasks
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
18-12-2025 Closed
Work Detail
Design Areas Included In This Request For Tender: O Hvac Design O Building Automation Design O Electrical Design O Lighting Design The Design Is Carried Out As Follows And This Procurement Applies To Part 2: Part 1: Main And Ark Design Tasks. O Part 2: Tendering For The Remaining Design Tasks Separately. Other Design Tasks Also Include The User Administrations Own Designs (E.G. Av Design). O Other Necessary Consultations (Such As Moisture Management, Cleanliness Management And Safety Coordination As Well As Supervision, Construction, Special Quality Assurance, Etc. Consultation Services) Later.- Planning Requires E.G. To The Building Group, Which Is The Careful Matching Of The Architecture, To The Systems Which Are The Consideration Of Interest Rates And Timely Approval And The Coordination Of Building Technology. An Alternative Dumping Site For The Outgoing Snow Farm Is Being Investigated.- This Rfp And Its Attachments Will Be Followed In Planning Tasks.- A Design Contract Will Be Concluded Between The Customer And The Company Or Work Association That Made The Offer, In Which Case The Other Designers Involved In This Procurement Will Act As Sub-Consultants Of The Bidder. - Plans And All Documentation Are Prepared In Finnish. Communication Related To The Project Uses The Finnish Language. - The Design Work Is Carried Out In Accordance With The Laws, Regulations And Task Lists Specific To The Design Field. - Design Fields Have A Data Modeling Obligation (Ytv 2012, Data Model Accuracy Level 2).- Other Design-Related Instructions In Accordance With The Design Program (Dry Chain 10, P1 Cleanliness Class, Accessibility, Signage Design, Final Documentation, Service Book Obligations, Planning Instructions Of The Oulu Facilities Services Business, Etc.). The Instructions Will Be Determined Finally After The Negotiations (Quality Requirements, Special Tasks Specific To The Design Field, Possible Additions To The List Of Tasks).- Link To The Customers Instructions: Https://Www.Ouka.Fi/Tilapalvelut/Yheitstyopähätällie About The Demandingness Categories Of The Design Task:- The Qualification Requirements For Designers Are Based On The Ministry Of The Environments Guidelines On The Eligibility Of Building Designers And The Objects Design Sector-Specific Demandingness Category Rakmk A2 / Ym2/601/2015. - The Tenderer Is Responsible For Meeting The Qualifications Of The Designers In The Design Fields They Offer Throughout The Project, As Well As For The Approval Of Their Designers By The Building Control Authority. - Oulus Building Control Is Involved In The Uniform Building Practices Drawn Up By Finlands Largest Municipalities. The Aim Of The Practices Is To Unify The Requirements Throughout The Country. The Eligibility Requirements For Designers And The Difficulty Classifications Of Design Tasks Are Presented In The Topten Card Catalog, Link: Https://Toptenrava.Fi/ - The Tenderer Must Also Take Into Account The Instructions Of The Oulu Building Control On Planning And The Eligibility Of Designers. The Tenderer Must Also Make Sure Of The Necessary Qualifications And Take Into Account The Suitability Requirements Set For The Procurement.- The Difficulty Category Of The Main Design Is Determined According To The Most Demanding Design Task. - According To The Customers Assessment, It Is At Least A Demanding Design Task. The Tasks Included In The Assignment Are Presented In The Task Lists. In Addition To These:- The Design Team Undertakes To Implement The Design Assignment In Accordance With The Kuivaketju10 Operating Model. Moisture Coordination During Planning And Construction Is Carried Out By An Expert Appointed By The Customer. - The B-Building Of Alakylä School Must Be At A Basic Level Of Accessibility. The Basic Level Represents A Very Good Level Of Accessibility And It Mainly Enables All User Groups To Move And Operate Without Barriers. Accessibility Means Ease Of Use For Everyone. - In The Planning, The Latest Planning And Final Documentation Instructions Of The Oulu Tilapalvelut Business Institution Are Followed: Http://Www.Ouka.Fi/Oulu/Tilapalevlut/Yheitstyopähättini, As Well As The Instructions And Regulations Of The Building Control Of The City Of Oulu, As Well As Other Valid Laws, Regulations And Instructions Of The Authorities.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a3ccf7fb-5dc9-4ae4-b0a3-8293b7524249.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders