GTR 105397150

Tenders Are Invited For Architectural, Engineering And Planning Services – Construction Of A Charging Infrastructure For E-Mobility, Planning Services, Specialist Electrical Planning

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
105397150
Tendering Authority
Subscribe to view
Tender No
784475-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural, Engineering And Planning Services – Construction Of A Charging Infrastructure For E-Mobility, Planning Services, Specialist Electrical Planning
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
08-01-2026 Closed
Work Detail
Architectural, Engineering And Planning Services – Construction Of A Charging Infrastructure For E-Mobility, Planning Services, Specialist Electrical Planning. The Order Specifically Covers The Services Of The Specialist Electrical Planning Service Profile. Lph 1-9 Should Be Commissioned. The Planning, Tendering And Implementation Of The Measure Therefore Includes The Following Points: - Renewal Of The Nshv In The Transformer Station, - Construction Of A New Electricity Distribution Network For The Charging Infrastructure. - Installation Of Ac And Dc Charging Points With Appropriate Supply To The Vehicles Via The Ceiling, The Wall Or As Columns. - Load Management For Intelligent Control Of Charging Processes. - Data Network For The Charging Infrastructure. - Backend Solution For Billing And Evaluation Of Charging Data. It Is Planned To Create Around 56 Charging Points In Five Halls By Mid-2028 And To Prepare The Infrastructure For Around 50 Additional Charging Points So That Additional Charging Points Can Be Retrofitted In The Halls If Necessary. In A Further Construction Phase (2029/2030) It Is Currently Planned To Create A Further 27 Charging Points And To Create The Infrastructure For Around 10 Of Them. These Charging Points Must Be Taken Into Account When Dimensioning The Power Supply. According To A Fleet Analysis Carried Out, Around 106 Charging Points Are Required To Convert All Possible Vehicles To Electric Drives. The Numerical Discrepancy Between The Planned Charging Points And Those Of The Vehicle Analysis Allows Us To React Flexibly To The Changing Requirements Of Vehicles And Parking Spaces. The Construction And Depot Has Its Own Transformer Station With A 315 Kva Transformer And A Photovoltaic System With 281 Kwp. The Fleet Analysis Has Shown That Supplying The Charging Points Is Only Possible With Good Load Management. This Is Therefore Also An Essential Point Of Planning Performance. The Amount Of Electricity Charged By Individual Vehicles Must Be Recorded And Further Processed. For Example, The Loading Volumes Of The Garbage Trucks Must Be Recorded For The Garbage Fees And, For Private Cars, The Consumption For Billing The Employees. This Requires A Comprehensive And User-Friendly Backend Solution
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
0a354d1f-e443-4a7d-b150-dde2c498ad7b.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders