Refrigerating And Freezing Equipment – Eth, Chn, Kältezentrale + Kühlturm. The Existing Refrigeration Machines Will Be Shut Down And Dismantled, As Will The Existing Cooling Tower On The Chn High-Rise. Three New Refrigeration Machines Will Be Built (Total 4.3 Mw Cooling Capacity), With The Possibility Of Expanding A Fourth Machine. The Waste Heat Is Dissipated Via A New Cooling Tower (Location On The Roof Of The High-Rise Building) And Three Hybrid Dry Coolers (New Location On Floor J). One Of The Four Chillers Can Be Used As A Heat Pump; The Thermal Energy Generated Is Used For Heating Purposes. A Flawless Delivery Includes All Professional, Completed Work Including All Associated Ancillary Work And Material Deliveries. All Components Required For Operation And The Dry Cooler Are Included. The Electrical Work And Hydraulic Connections Are Excluded (According To The List Of Services).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.