1. The Subject Of The Order Is The Implementation Of A Construction Project Titled: Development Of Sustainable Urban Mobility Through The Construction Of Transfer And P&R Centers With Accompanying Infrastructure And The Expansion Of The Its System In The Communes Of The Wałbrzych Agglomeration - Wałbrzych, Boguszów Gorce, Czarny Bór, Dobromierz, Głuszyca, Jedlina-Zdrój, Mieroszów, Szczawno-Zdrój, Stare Bogaczowice, Walim, Świebodzice In The Design And Build Mode In The Part Regarding The Construction Of A Transfer Center With Accompanying Infrastructure In Wałbrzych.2. As Part Of The Subject Of The Order, It Is Necessary To: 1) Develop Comprehensive, Full-Discipline Design Documentation With Authors Supervision And Obtain, On Its Basis, The Administrative Decisions Necessary For Implementation, Including The Decision On The Building Permit. The Documentation Should Include In Particular: I) Geodetic Situational And Elevation Maps For Design Purposes, Ii) A Detailed Inventory Of The Area Covered By The Study, Iii) A Multi-Discipline Construction Design, Prepared In Accordance With The Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Design (Consolidated Text: Journal Of Laws Of 2022, Item 1679, As Amended). As Amended), I.E. Land Development Design (Pzt), Architectural And Construction Design (Pab) And Technical Design (Pt),Iv) All Arrangements Required By Law, Opinions, Necessary Technical Conditions, Approvals, Permits And Derogations,V) Arrangements By Appraisers, If Required, For: Fire Protection, Sanitary And Hygiene And Occupational Health And Safety,Vi) Designs For The Demolition Of Structures Intended For Demolition And Colliding With The Solutions Design,Vii) Multi-Discipline Executive Designs,Viii) Interior Design Design Including, Among Others, Interior Color Designs, Selection Of Materials (Including Furniture, Sanitary Fittings, Etc.),Ix) Energy Performance, Which Must Be Performed In Accordance With The Regulation Of The Minister Of Infrastructure Of February 27, 2015 On The Methodology For Determining The Energy Performance Of A Building Or Part Of A Building And Energy Performance Certificates (Journal Of Laws Of 2015, Item 376, As Amended),X) Documentation As-Built Construction Documentation,Xi) As-Built Surveying Documentation,Xii) Traffic Organization Design For The Construction Period (If Necessary),Xii) Operation And Use Instructions For The Facilities And The Adjacent Area,Xiv) Construction Assessments And Opinions As Well As Expertise In The Field Of Necessary To Obtain Construction Permits And Implementation Of The Facility,Xv) Traffic Organization Design (Target),Xvi) Fire Safety Instructions,Xvii) Other Resulting From Legal Provisions, Obtained Arrangements, Necessary To Obtain A Permit To Carry Out Construction Works/Demolition Permit And To Obtain A Document Authorizing The Use Of The Facility In Accordance With The Provisions Of Law, Xviii) Documents Ref