I. Description Of The Subject Of The Order: Common Procurement Dictionarycpv 51900000-1 - Installation Services Of Control And Control Systemscpv 71630000-3 - Control And Technical Supervision Servicescpv 42961000-0 - Control And Control Systemsthe Purpose Of The Order Is To Inspect And Renovate The Pressure Treatment Plants In Kruszwica, Piecki, Chełmce And To Perform Monitoring And Scada Visualization For The Rzepowo Pressure Boosting Station. The Tasks Include: • Delivery And Assembly Of Materials And Devices, • Execution Of Installation And Programming Works, • System Launch, • Training Of Employees In The Use Of Devices And Data Analysis. Detailed Description Of The Subject Of The Order: Task 1: Modernization Of The Water Supply Station - Flow Meters1) Kruszwica Water Supply Plant: Purchase And Installation Of The Missing Flow Meter For The Well - Dn150 Flowmeter Intended For Remote Reading, 2) Water Supply Plant Chełmce: Purchase And Installation Of The Missing Flow Meter For The Well - Dn100 Flow Meter Intended For Remote Reading,3) Piecki Suw: Purchase And Installation Of Missing Flow Meters For The Well (2 Pcs.) - Dn100 Flow Meter Intended For Remote Reading, Task 2: Modernization Of The Suw And Spc Rzepowo - Monitoring1) Kruszwica Suw:• Performing A General Inspection In The Field Of Control And Automation Along With An Inspection Report,• Execution Connection Of The Installation And Visualization In The Existing Scada Monitoring System For All Flow Meters In Wells (A Total Of 4 Pcs), • Visualization Of The Water Table Level In Deep Wells.2) Chełmce Suw: • Performance Of A General Inspection In The Field Of Control And Automation Along With An Inspection Report, • Connection Of The Installation And Visualization In The Existing Scada Monitoring System For All Flow Meters In Wells (A Total Of 2 Pcs), • Performance Of A Visualization Of The Water Table Level In The Wells Deep-Water Plants.3) Piecki Suw:• Performing A General Inspection In The Field Of Control And Automation Along With An Inspection Report,• Performing Installation Connection And Visualization In The Existing Scada Monitoring System For All Flow Meters In Wells (2 Pcs. In Total),• Visualizing The Water Level In Deep-Water Wells.4) Spc Rzepowo: Performing Monitoring And Visualization In The Rzepowo Scada System• Performing Station Operation Signaling (On/Off), Pressure Measurement (In/Out), Replacing The Water Meter With A Flow Meter With Remote Reading In The Scada System. Attention! 1. The Dismantling Materials Remain At The Ordering Partys Disposal. The Contractor Is Obliged To Deliver Them At His Own Expense To The Place Indicated By The Ordering Party.2. The Contractor Will Provide The Ordering Party With A Minimum 24-Month Quality Guarantee. The Quality Guarantee Period Is The Criterion For Evaluating Offers.3. During The Warranty Period, The Contractor Undertakes To Provide Warranty Service, Including Warranty Inspections. The Cost Of The First Warranty Inspection Is
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.