Tenders Are Invited For Technical Water Assessment, Detailed Design, Boq Preparation And Rehabilitation Supervision Of 7 No. Surface Wells In Jowhar District (Somalia)

Tender Detail

105349760
Self-Funded
Tenders Are Invited For Technical Water Assessment, Detailed Design, Boq Preparation And Rehabilitation Supervision Of 7 No. Surface Wells In Jowhar District (Somalia)
NCB
Eastern Africa
Arab World1,African Union
04-12-2025

Work Detail

Tenders are invited for Technical Water Assessment, Detailed Design, Boq Preparation and Rehabilitation Supervision of 7 No. Surface Wells in Jowhar District (Somalia). Closing Date: 4 Dec 2025 Type: Consultancy Overview of the project The consultancy is part of the AICS funded project ARISE - Agriculture, Water Resources, Food Security, and Gender Equity for the Communities of Jowhar District, Hirshabelle, Somalia The overall objective of the action is to Improve the living conditions of the most vulnerable segments of the population affected by the humanitarian emergency in Somalia.. The specific objectives of the action is to respond to the needs of the local population to improve their resilience and living conditions. Food security and the creation of livelihood opportunities, access to water and basic services (primarily nutritional and maternal-child health), and social protection networks remain a key aspect of this Initiative. In order to strengthen access to water, CEFA is implementing rehabilitation of shallow wells and promotion of O&M (operation and maintenance) of rehabilitated facilities in 7 pre-identified locations. Objectives of the Consultancy The objective of the consultancy is to: In collaboration with CEFA technical team, assess the feasibility of rehabilitation works of pre-identified 7 shallow wells within 7 villages in Jowhar district (Hirshabelle, Somalia); Carry out water demand for the selected villages vis a vis the potential sources of water; Provide detailed design, drawings and BoQ for all proposed infrastructures for 7 No. shallow wells (e.g., solar panels and solar submersible pump - pumping stations, storage tanks, water kiosks); Conduct the supervision of the works implemented by the selected contractor(s). Facilitate creation and registration of Water Users Associations (WUA) + facilitate Operations and Maintenance training of the beneficiaries, together with CEFA WASH field officer; Scope of Consultancy: This assignment will be executed in four (4) phases. Phase one (1) will consist of technical/feasibility studies, and design, Phase two A (2A) will consist of supervision of the construction works. Phase two (2B) will consist of Defect Liability period Phase three (3) will consist of Operations and Maintenance training of the beneficiaries (WUA) Specific tasks per phase Phase one (1) - Technical/feasibility studies and design This phase will be characterized by initial stakeholder engagements, Site visits for the assessment of the already identified shallow wells in Jowhar, water sources assessment, water demand analysis, preposition of design alternatives, topographical surveys and mapping of sites, detailed design, drawings and development of bill of quantities. In this phase the consultant will be expected to carry out the following tasks: Engage the relevant stakeholders (Ministry of Health, Ministry of Energy and Water Resource and beneficiaries of targeted villages) in the final site assessment The consultant will conduct technical feasibility of the proposed sites in terms of the rehabilitation needed. Assess the beneficiary community domestic and livestock water needs and propose interventions to satisfy the water demand. Carry out topographical survey and mapping of the location of proposed infrastructure Propose sound engineering alternatives with cost estimates to be selected for the final design. The alternatives must be adequate to provide domestic water to the 7 selected villages Conduct detailed design of the proposed infrastructure which could include but not limited to; Pumping stations, solar panels and solar submersible pump, storage tanks, water kiosks. Generate a detailed and accurate BoQ and Engineers estimate for the designed facilities Develop manual that the WUA can use as reference. Phase Two (2A) - Supervision of the construction works In this phase the consultant shall perform the principal services of the engineer responsible for the supervision of the works in accordance with the FIDIC guidelines which will include but not limited to; Represent the interests of CEFA under the Works Contract, in any manner related to the Works Contract and the proper execution thereof; Review and comment or approve the Contractors work program, method statements, proposals for materials sources, quality management plan, including testing laboratories and procedures for testing. Engineers approval; Be on site at all times during the construction and be present at critical stages of the work especially On-Site handover, on materials delivery, concreting, testing and commissioning etc.) to observe the progress and quality of the Contractors work. Check and establish that the Contractor mobilizes and supplies to the site all materials, equipment and machinery that have been committed in its bid, and ensure that all such items remain on site until their release has been authorized. Ensure that the Contractor properly records all equipment, materials and labour which have been supplied under the Contract. Provide timely assistance and direction to the Contractor in all matters related to the interpretation or clarification of the Works Contract. Issue instructions, in accordance with the authority specified in the Conditions of Contract, to Contractors, such that works can proceed expeditiously; Monitor progress against program, instructing the Contractor to revise its program as necessary in order to meet due completion dates; Ensure that the Works are executed in accordance with the drawings and that the quality of workmanship and materials is in compliance with the technical specifications. Evaluate and determine acceptability of substitute or equal materials and equipment proposed by the Contractor; Liaise with communities and project affected persons of the works undertaken under the Project; Mediate on any conflict or request between the Client, contractor, Land owners or community members. Review and comment on, or recommend approval of, Contractors proposals for variations; Prepare and submit reports on the progress of the Works, the Contractors performance, quality of works and the final reports after testing. Review and certify all Interim payment certificates submitted by the contractor before forwarding to CEFA Upon completion of the Works, carry out the necessary inspection, propose to CEFA /Project Engineer; a date for a joint inspection, Prepare and issuance of the Certificate of Provisional Completion to the contractor Review and comment on or approve as-built drawings prepared by the Contractor; Prepare and Submit Inception, Monthly Progress, Final and Special Reports; Perform all other tasks, not specifically mentioned above, but which are necessary and essential to ensure the successful supervision and control of all the construction activities, in accordance with the terms of the Works Contract. Phase Two (2B) Defects Liability Period During this phase the Consultants tasks shall include the following: Inspect the Works at monthly during the Contractors Defects Liability Period which be two months; and, Prepare a final deficiency list monthly during DLP in cases where remedial work is required Supervise any remedial works and satisfy himself and the Client that the defects have been corrected satisfactorily Carry out the Final Inspection of Works together with representatives of CEFA /Project Engineer and the Contractor Prepare and issue the Final Acceptance Certificate in consultation with CEFA /Project Engineer and the collaborating agencies; Prepare the Final Payment Certificate. Prepare as built drawings for the completed works Phase Three (3) Operations and Maintenance training of the beneficiaries This phase will be done during the defect liability period; The consultant will be expected to hold meetings with beneficiaries to train them on critical aspects of operations and maintenance of the water system. This will be achieved through Organizing lectures on different topics of water use, water management, operation and maintenance of the water system, pumping stations, and all related topics; Organize practical technical lessons in the water system site; Specific tasks will be Prepare and submit to CEFA for approval comprehensive training modules on the following topics Management and use of the water Technical aspects of operation and maintenance of the designed shallow wells Train 15 for each of the 7 WUA committees using lectures and practical demonstration in the field Create together with the WUA members an operation and maintenance monitoring schedule of the water system and infrastructure. Preparation of final training report with pre and post training questionnaire analysis. Preparation of comprehensive operations and maintenance manual Summary of Deliverables The expected deliverables are as follows: Phase 1-Design phase All reports will be shared with the project manager on or before the designated time and in appropriate formats including word, excel, pdf Inception Report This report will be submitted within 2 weeks after signing the contract to confirm that the team has been established and has started working. The report should detail out how the consultant intends to undertake the work; General information about the firm/individual including physical facilities available for this assignment; Detailed work plan and activity schedule with time frame; Any other information, conditions or restrictions that the Firm considers necessary to carry out the stipulated activities. The inception report will also include the findings and minutes of initial start-up meetings together with results of preliminary site visits. Feasibility study and draft design report This report will be submitted within 1 months after signing the contract. The report will consist of the following: Situational analysis of pro Tender Link : https://reliefweb.int/job/4187988/technical-water-assessment-detailed-design-boq-preparation-and-rehabilitation-supervision-7-no-surface-wells-jowhar-district-somalia

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document dce9743d-d2ff-4412-8dbd-ee3229b53304.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail