Tenders Are Invited For Preliminary Technical Assessment, Boq Preparation And Supervision Of Rehabilitation/Construction Of Vip Latrines In Schools And Idp Camps In Johwar

Tender Detail

105349759
Self-Funded
Tenders Are Invited For Preliminary Technical Assessment, Boq Preparation And Supervision Of Rehabilitation/Construction Of Vip Latrines In Schools And Idp Camps In Johwar
NCB
Eastern Africa
Arab World1,African Union
05-12-2025

Work Detail

Tenders are invited for Preliminary Technical Assessment, Boq Preparation and Supervision of Rehabilitation/Construction of Vip Latrines in Schools and IDP Camps in Johwar. Closing Date: 5 Dec 2025 Type: Consultancy Overview of the project The consultancy is part of the AICS funded project ARISE - Agriculture, Water Resources, Food Security, and Gender Equity for the Communities of Jowhar District, Hirshabelle, Somalia. The overall objective of the action is to improve the living conditions of the most vulnerable segments of the population affected by the humanitarian emergency in Somalia. The specific objectives of the action is to respond to the needs of the local population to improve their resilience and living conditions. Food security and the creation of livelihood opportunities, access to water and basic services (primarily nutritional and maternal-child health), and social protection networks remain a key aspect of this Initiative In order to strengthen access to Toilets and promote Hygiene, CEFA is implementing rehabilitation/ Construction of VIP latrines in schools (4) and IDP camps(3). A total of 118 latrines constituting male, female and PWDs with installation of water, soap points and solar lighting. Objectives of the Consultancy The objective of the consultancy is to, in collaboration with CEFA technical team, assess the feasibility of rehabilitation/ construction works of pre-identified toilets within 4 schools and 3 IDPs camp in Jowhar District (Hirshabelle, Somalia); Carry out water demand for the selected project vis a vis the potential sources of water; Provide detailed design, drawings and BoQ for all proposed infrastructures Conduct the supervision of the works implemented by the selected contractor(s). Scope of Consultancy: This assignment will be executed in Three (3) phases. Phase one (1) will consist of technical/feasibility studies, survey and detailed design, Phase two A (2A) will consist of supervision of the construction works. Phase two B (2B) will consist of supervision / Inspection during the defect liability period (DLP) Specific tasks to be undertaken by the Consultant in each per phase Phase one (1) - Technical/feasibility studies, Survey and Detailed Design This phase will be characterized by initial stakeholder engagements, Site visits for the assessment of the already identified sanitation facility to be constructed / rehabilitated in Johwar, preposition of design alternatives, topographical surveys and mapping of sites, detailed design, drawings and development of bill of quantities. During Phase-1 of the assignment, the consultant will be expected to carry out the following tasks: Engage relevant stakeholders and beneficiaries of targeted camps/ schools in the final site assessment; The consultant will conduct technical feasibility of the proposed sites in terms of the rehabilitation / Construction Works needed; Assess the beneficiary community water needs and propose interventions to satisfy the water demand (according to SPHERE standards); Carry out topographical survey and mapping of the location of proposed infrastructure; Conduct detailed design of the proposed infrastructure. Generate a detailed and accurate BoQ and Engineers estimate for the designed facilities; The design should include dedicated latrines for PWD as well as accessibility features Identify negative Environmental and social impacts the proposed project may pose to the environment and community Phase Two (2A) - Supervision of the construction works During this phase the consultant shall perform the principal services of the engineer responsible for the supervision of the works in accordance with the FIDIC guidelines which will include but not limited to; Represent the interests of CEFA under the Works Contract, in any manner related to the provisions of Works Contract and the proper execution thereof; Review and comment or approve the Contractors work program, method statements, proposals for materials sources, quality management plan, including testing laboratories and procedures for testing. Engineers approval; Be on site at all times during the construction and be present at critical stages of the works in particular during Site handover, setting out of works, materials delivery, concreting, testing and commissioning and to observe and report to the Client the progress and quality of the Contractors work. Check and establish that the Contractor mobilizes and supplies to the site all materials, equipment and machinery that have been committed in its bid, and ensure that all such items remain on site until their release has been authorized. Ensure that the Contractor properly records all equipment, materials and labour which have been supplied under the Contract. Provide timely assistance and direction to the Contractor in all matters related to the interpretation or clarification of the Works Contract including drawings and specifications. Issue instructions, in accordance with the authority specified in the Conditions of Contract, to Contractors, such that works can proceed expeditiously; Monitor progress against program, instructing the Contractor to revise its program as necessary in order to meet due completion dates; Ensure that the Works are executed in accordance with the drawings and that the quality of workmanship and materials is in compliance with the technical specifications. Evaluate and determine acceptability of substitute or equal materials and equipment proposed by the Contractor; Liaise with communities and project affected persons of the works undertaken under the Project; Mediate on any conflict or request between the Client, contractor, Land owners or community members. Review and comment on, or recommend approval of, Contractors proposals for variations; Prepare and submit reports on the progress of the Works, the Contractors performance, quality of works and the final reports after testing. Review and certify all Interim payment certificates submitted by the contractor before forwarding to CEFA Project Manager Upon completion of the Works, carry out the necessary inspection, propose to CEFA /Project Engineer; a date for a joint inspection, Prepare and issuance of the Certificate of Provisional Completion to the contractor upon completion of works; Review and comment on or approve as-built drawings prepared by the Contractor; Prepare and Submit Inception Report, Monthly Progress Reports and Final Report and any Special Reports as may be required by the project manager; Perform all other tasks, not specifically mentioned above, but which are necessary and essential to ensure the successful supervision and control of all the construction activities, in accordance with the provision of condition for contract works. Phase Two (2B) Defects Liability Period During this phase the Consultants tasks shall include the following: Inspect the Works at monthly during the Contractors Defects Liability Period; and, Prepare a final deficiency list monthly during DLP in cases where remedial work is required Supervise any remedial works and satisfy himself and the Client that the defects have been corrected satisfactorily Carry out the Final Inspection of Works together with representatives of CEFA /Project Engineer and the Contractor Prepare and issue the Final Acceptance Certificate in consultation with CEFA /Project Engineer and the collaborating agencies; Prepare and issuance of the End of Defects Liability Certificate to the Contractor at the End of Defects Liability Period; Review of contractors Final Statement of accounts and Submission of the same to CEFA Project Manager at the End of Defects Liability Period completion to the contractor upon completion of works; Prepare as built drawings for the completed works Summary of Deliverables The expected deliverables are as follows: Phase 1-Design Phase All reports including design calculations will be submitted to the Project Manager on or before the designated time and in appropriate formats including word, excel, pdf and AutoCAD (.dwg) for drawings. 1) Inception Report This report will be submitted within 2 weeks after signing the contract to confirm that the team has been established and has started working. The report should detail out how the consultant intends to undertake the assignment; General information about the firm/individual including physical facilities available for this assignment; Detailed work plan and activity schedule with clear time frame; Any other information, conditions or restrictions that the Firm considers necessary to carry out the stipulated activities. The inception report will also include the findings and minutes of initial start-up meetings together with results of preliminary site visits including location maps. It is only upon review and acceptance of the Inception Report by the Project Manager that the Consultant will be deemed to have completed this deliverable of the assignment. 2) Feasibility study and draft design report This report will be submitted within 6 weeks after signing the contract. The report will consist of the following: Synopsis of the assignment including inception; Design criteria and considerations for the proposed sanitation and water supply systems (; Location maps of the proposed projects sites; Layout of proposed water supply systems; Design Consultation for water demand modeling, pipeline hydraulics and sizing etc; Calculation for solar design and pump sizing; Detailed analysis of project alternatives including preliminary cost estimates for sanitation and water supply in both schools and IDP camps; Proposed most suitable alternatives with clear justifications in line with the local prevailing situation; Draft BOQs for the proposed most suitable options or alternatives; Draft Detailed Drawings including layouts for the m Tender Link : https://reliefweb.int/job/4188066/preliminary-technical-assessment-boq-preparation-and-supervision-rehabilitationconstruction-vip-latrines-schools-and-idp-camps-johwar

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 2d087c4e-df23-4630-b004-e81e9418a598.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail