3.2. The Material Scope Of The Subject Of The Order Includes The Comprehensive Implementation By The Contractor Of All Works, Supplies And Activities Necessary To Perform The Recultivation Of The Waste Landfill Site No. S1, Located On Plots Constituting The Waste Landfill Area Of The City Of Poznań In Suchy Las, At Ul. Meteorytowa 1. The Material Scope Of The Subject Of The Order Includes In Particular: - Formation, Sorting And Leveling Of The Waste Deposit - Transfer Of Waste To The Canopy Of Section S1 In Order To Create The Assumed Inheritances On The Section, Partly Including A Reference To The Reclaimed Section P2. The Maximum Elevation With The Reclamation Layer Will Be Approximately 117.0 Above Sea Level. Above The Elevation Of 117.0 M Above Sea Level Degassing Wells May Protrude, - Implementation Of A Technical Layer Protecting Against Water And Wind Erosion Of Slopes And The Surface Of The Crown Consisting Of A Layer Of Waste, - Implementation Of A Sealing Layer With A Thickness Of 0.5 M Of Clay (Or Sandy Clay Or Loamy Sand), - Construction (Layer) Of Biological Cover, - Construction Of An Active Degassing System For Waste Storage Area No. S1 Along With A Container Biogas Collection Station, And Integration Into The Existing Installation And Further Directing The Generated Biogas To A Heat And Power Plant Located On The Premises Of The Waste Landfill, - Installation Of Rainwater And Snowmelt, Along With Its Connection To An Existing Ditch Located In The Landfill, - Construction Of A Sewage Pumping System For Leachates From The Two Leachate Pumping Stations Planned For Construction, Together With A Leachate Infiltration System In The Area Of The Bowl Of Section No. Planned Pumping Station For The Ditch Located At The Foot Of The Slope Of Plot P1, - Construction Of An Underground Power Installation In Order To Connect To It A New Gas Collection Station Planned For Construction And Two Leachate Pumping Stations Planned For Construction, - Sealing Of Parts Of The Slopes Between The Reclaimed Plot No. P3 And Plot No. S1, - Construction Of Reinforced Concrete Stairs To Plot No. S1, - Planting Grass Over The Entire Reclaimed Area Of Plot No. Sandy Clay With A Thickness Of 0.5 M In An Estimated Maximum Quantity Of 12,423.24 M³ And/Or Waste With Code 17 05 04; C) Material For Dikes Made Of Clay Or Sandy Loam In An Estimated Maximum Quantity Of Approx. 1,452.0 M³ And/Or Waste With Code 17 05 04; D) Biological Reclamation Cover With A Thickness 1.0 M From Waste With Codes: 17 05 04, 19 05 03, 20 02 02 - In The Estimated Maximum Total Amount Of Approx. 24,768.45 M³; E) Technical Recultivation Layer From Waste With Codes: 10 09 08, 10 12 08, 17 01 01, 17 01 02, 17 01 03, 17 01 07, 17 05 08, 19 12 09 - In The Estimated Maximum Quantity Of Approx. 6246.90 M³. The Contractor Is Obliged To: A) Obtain, Transport And Deliver All The Above-Mentioned Materials Or Waste On The Investment Site, B) Their Installation Using Own Equipment, Forces And Resources,
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.