GTR 105173048

Tenders Are Invited For Iv Renovation Of F.E Sillanpää School

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
105173048
Tendering Authority
Subscribe to view
Tender No
2025-034484
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Iv Renovation Of F.E Sillanpää School
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
16-01-2026 Closed
Work Detail
Renovation Target F.E. Sillanpää Joint School/High School, Ristamäentie 13, 39100 Hämeenkyrö. Renovation Of The Ventilation System: The Ventilation System Will Be Updated As Needed With Room- And Zone-Specific Air Volume Controls. The Ventilation Network Will Be Dismantled In The Necessary Parts. Building Automation: The Building Automation Will Be Renewed And Connected To Schneiders Control Room. The Ventilation And Heating System Will Be Transferred To The New Automation. Structural Work: The Necessary Surfaces And Structures Will Be Opened And Renewed. After, The Work Must Be Done In Such A Way That It Does Not Interfere With The Teaching Work And Interruptions In Use Are Kept As Short As Possible. Special Attention Is Paid To The Cleanliness Of The Work Area And Dust Protection. Noisy Work Phases Are Scheduled In Such A Way That They Disturb The Schools Operations As Little As Possible. Reception. Operating Instructions Are Given To The Users For At Least Four Hours. Environmental Effects: Material Efficiency And Recycling Are Taken Into Account. Adjusted For Use. Since The Work Is Carried Out In An Already Completed Building, The Contractor Must Familiarize Himself With The Work Site Before Submitting An Offer So That The Contractor Is Fully Aware Of The Prevailing Conditions Before Signing The Contract. The Times Of The Visits Must Be Agreed With The Property Manager Mika Hiire. Work That Interferes With And Restricts Teaching And School Attendance Must Be Completed During The School Childrens Summer Vacation 2026, From The Beginning Of June To Mid-August. Basically, The Contract Must Be Completely Completed And Handable By The End Of September 2026 Or At A Time Agreed Separately In The Contract Contract. All Hvac Work Is Fully Included In The Contract. The Work Is Carried Out In Accordance With The Work Description And The Drawings Mentioned In The List Of Drawings. The Contract Object Is Handed Over To The Developer After The Inspections By The Authorities Have Been Completed In A Normal Acceptable Condition. Talotekniikka-Ryl And Yse 1998 Are Followed.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
fd945191-4ee5-4d3c-b433-b25b6c1d6809.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders