GTR 105109826

Quotation Are Invited For Removal Of Old Ms Pipes, Design, Supply, Installation, Testing And Commissioning Of Gre Pipes Along With Valves & Accessories

ICB — International Competitive Bid Closed Asia
Tender Information
GTR Reference
105109826
Tendering Authority
Subscribe to view
Tender No
2332502918
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Removal Of Old Ms Pipes, Design, Supply, Installation, Testing And Commissioning Of Gre Pipes Along With Valves & Accessories
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
24-11-2025 Closed
Work Detail
Quotation are invited for Removal of Old MS Pipes, Design, Supply, Installation, Testing and Commissioning of GRE Pipes along with Valves & Accessories for Jebel Ali Tank Tanker Points 5 & 6. 1.0 SCOPE OF WORKSTHE SCOPE OF WORKS FOR PIPE REPLACEMENT AT TANKER POINTS IS AS FOLLOWS:·#THE WORK CONSISTS OF REMOVAL OF OLD DEFEC TIVE MS PIPES (DIA-150MM)AND THE DESIGN, SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF GREPIPES (DIA-150MM) ALONG WITH VALVES AND ACCESSORIES FOR JEBEL ALI TANKTANKER POINTS 5 & 6.·#PREPARATION OF SHOP DRAWINGS.·#SUBMISSION OF MATERIALS, METHOD STATEMENT, AN D OTHER DOCUMENTS ASAPPLICABLE.·#OBTAINING PERMITS/APPROVAL FROM THE CONCERNED GOVERNMENT DEPARTMENT,IF REQUIRED.·#ARRANGEMENT OF AL L LIFTING GEARS, SCAFFOLDING, AND ELECTRICITY TOCARRY OUT THIS JOB.FOR FURTHER CLARIFICATION, PLEASE CONTACT MR. NOOR ATMD.NOORUDDIN @DEWA.GOV.AE.2.0 PRIOR TO SUBMISSION OF QUOTATION·#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, FACILITIES, COMPLEXITIES, AND ANY SPECIFIC SITECONDITIONS PRIOR TO SUBMITTING THE QUOTATION.·#DEWA WILL NOT ACCEPT ANY CLAIM FOR EXTRAS BEYOND THE ORDERRATES/PRICES DURING OR AFTER THE EXECUTION OF THE WORK ORDERED.·#THE CONTRACTOR WILL BE PROVIDED WITH THE JOB SCHEDULE/PROGRAM INCOORDINATION WITH THE METERING & EQUIPMENT DEPARTMENT.·#THE CONTRACTOR SHOULD SUBMIT A TIME SCHEDULE OR BAR CHART INDICATINGEACH ACTIVITY FOR THE PROJECT.·#UPON COMPLETION OF THE WORK, THE INSPECTION CHECKLIST OF QUALITYPROCEDURES, WHEREVER APPLICABLE, SHOULD BE FILLED IN AND SUBMITTED TODEWA.·#SITE SUPERVISION, COORDINATION OF FIELD ACTIVITIES, SUPPLY OFREQUIRED TECHNI CIANS, TOOLS, EQUIPMENT, AND TACKLES NECESSARY FOR THEEXECUTION OF THE CONTRACT WORKS SHOULD BE SUITABLY CONSIDERED BY THECONTRACTOR .3.0 TAKE OVER·#A CERTIFICATE OF COMPLETION WILL BE ISSUED BY DEWA AFTER A FINALINSPECTION, ONLY WHEN THE CONTRACT WORK IS DEEMED TO HAVE BEEN TAKENOVER BY DEWA FOLLOWING NECESSARY CONDITION MONITORING CHECKS WHEREVERAND WHENEVER REQUIRED.4.0 FACILITIES PROVIDED B Y DEWA·#ELECTRICITY AND WATER AT ONE CONVENIENT POINT IN THE PLANT. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO ARRANGE FOR EXTENSI ON OF THESEUTILITIES TO HIS WORK AREAS. FOR ANY BULK STORAGE OF WATER, THECONTRACTOR SHOULD MAKE HIS OWN ARRANGEMENTS FOR STORAGE TA NKS, ETC.[NOTE: THE CONTRACTOR IS REQUIRED TO FURNISH IN ADVANCE HIS REQUIREMENTSFOR POWER AND WATER WITH FULL JUSTIFICATION. THE CONTRACTOR SHALL NOTWASTE OR MISUSE THE FACILITIES PROVIDED BY DEWA.]5.0 WARRANTY·#ALL WORK CARRIED OUT SHALL CARRY A WARRANTY FOR TWO YEARS, OR ASOTHERWISE SPECIFIED, WHICHEVER IS EARLIER, WITHOUT ANY WATER LEAKAGEFROM THE TESTING PIPES.·#THE GUARANTEE WILL TAKE EF FECT FROM THE DATE OF TAKEOVER BY DEWA OFTHE JOB CARRIED OUT BY THE CONTRACTOR.·#IF A DEFECT IS NOTICED DURING THE WARRANTY PERIOD, THE CONTRACTORMUST RECTIFY THE DEFECT WITHIN A REASONABLE AMOUNT OF TIME FIXED BYDEWA, WITH NO CLAIM OR COMPENSATION.SAFETY PRECAUTI ONS·#THE CONTRACTOR SHALL STRICTLY ABIDE BY DEWA HSE PROCEDURES DURING THEENTIRE CONTRACT PERIOD. Qty: 2 Removal of old MS pipes, Design, Supply, Installation, Testing and Commissioning of GRE pipes along with Valves & Accessories for Jebel Ali Tank Tanker points 5 & 6. Contact [email protected] tel: 04-3229439 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332502918)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
db644c4e-33af-43d3-9841-4a7c76d20142.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders