Tenders Are Invited For Inspection Of The Shut-Off Fittings - Kito, Protego Valves Along With The Replacement Of Spare Parts On The Storage Fuel Tanks Of The Gardeja Depot - 121/2025
Tenders Are Invited For Inspection Of The Shut-Off Fittings - Kito, Protego Valves Along With The Replacement Of Spare Parts On The Storage Fuel Tanks Of The Gardeja Depot - 121/2025
► The Subject Of The Order Is The Inspection Of Shut-Off Fittings - Kito And Protego Valves, Together With The Replacement Of Spare Parts On Storage Fuel Tanks At The Gardeja Depot, In Accordance With The Description Of The Subject Of The Order And The Scope Of Services Included In The Description Of The Subject Of The Order And Under The Conditions Specified In The Draft Provisions Of The Contract. ► The Scope Of The Order Includes: 1) Inspection Of The Shut-Off Fittings - Kito Valves On The Storage Fuel Tanks Of The Gardeja Depot A) Technical Inspection Of The Shut-Off Fittings And Valves - Kito To Ensure Efficient, Safe And Reliable Operation, As Intended. B) The Inspection Includes Checking The Elements (A Detailed Description Is Included In The Description Of The Subject Of The Order): Combined Breathing Valves With Protection Against Long-Term Burning, Type Vd/Kl 50/25 Dn 50 - 2 Pcs.; Breathing Valve With Protection Against Long-Term Burning, Type Vd/Mc Dn 150 - 1 Pc.; Breathing Valves Type Beh-5-80 - 4 Pcs.2) Overview Stop Fittings - Protego Valves On The Storage Fuel Tanks Of The Gardeja Depota) Technical Inspection Of The Stop Fittings, Valves - Protego To Ensure Efficient, Safe And Reliable Operation, In Accordance With The Intended Use. B) The Inspection Includes Checking The Elements (A Detailed Description Is Included In The Description Of The Subject Of The Order): - Tubular Angular Detonation Flame Arresters Protego Dr/Es 150 Iia-P1,2 - 8 Pcs. (Hydraulic System); - Overpressure, Negative Pressure, Frost-Resistant Liquid, Breathing Valves Protego Ub/Sf-0-150 - 4 Pcs.; - Tubular Angular Flame Arresters Detonation Protego Dr/Es 150 Iia-P1,2 – 6 Pcs. (Mechanical System); Weight Breathing Valve Protego Vd/Sv - 150 - 2 Pcs.; ► The Service Includes: Checking The Technical Efficiency, Making The Necessary Adjustments, Cleaning And Replacing Used (Worn-Out) Spare Parts In Accordance With Chapter Ii Of The Description Of The Subject Of The Order; Ensuring The Efficient, Safe And Reliable Operation Of All Elements Of The Barrier Fittings System, In Accordance With Their Intended Use; Checking The Correctness Of All Valve Elements Installed, The Condition Of Screws, Fasteners, Catches, Etc. And Checking The Condition Of Varnish And Paint Coatings, And Legibility Of Markings And Nameplates. ► After The Inspection, The Contractor Is Obliged To Prepare An Inspection Performance Report Specifying The Activities Performed, The Replaced Consumables And Parts, Along With A Statement On The Correct Operation Of The Devices And On Preparation For Safe Operation Or Limited Safe Operation, Indicating The Date And Method Of Removing These Restrictions. ► Place Of Service – Fuel Tanks In Skład Gardeja, Commune. Rogóźno (1St Regional Logistics Base - Skład Gardeja, 86-318 Rogóźno).► The Ordering Party Reserves The Right To Inspect The Conditions Of Implementation And Acceptance Of Services By Authorized Representatives Of The Ordering Party And/Or Th
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.