Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
01-12-2025
Work Detail
Quotation are invited for Liquid Nitrogen System. Last Date for Submission:01/12/2025 Remarks PLC based StirLIN control system Volume: 10 L/H Nitrogen gas production module Liquid nitrogen production module Dedicated minor maintenance tool set for the Cryogenerator Remote monitoring device Annual Spare Parts Kit first year- Including: 1. Cylinder (50L 200bar) helium gas + regulator (European connection) 2. Water chiller 50 Hz for StirLIN-1 Compact (Each cryogenerator requires cooling water to remove the heat generated by the Stirling Cycle)- Terms and Conditions: 1. Warranty. 2. Delivery period. 3. Training for two service engineer at the manufacturer. 4. Installation and commissioning must be done by the supplier. 5. Pre-installation requirements if any Tender Link : https://tenders.squ.edu.om/AllCategs
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.