- Carrying Out Traffic Safety Measures In The Outcrops Located In The Area Of The L 190, - Carrying Out 4 Searches To Find Lines And Other Structures And Obstacles, - Carrying Out 4 Explosive Ordnance Soundings Using Auger Drilling Including Safety Detections, - Carrying Out 4 Machine Drillings Combined With A Single Core Pipe (Ekr, Using The Dry Drilling Method) With Sample Collection, - Carrying Out Borehole Ramming Soundings (Bdp) In Specified Areas Depth Levels Of The Machine Drillings To Be Carried Out, - Carrying Out 4 Heavy Ram Soundings (Dph) Adjacent To The Machine Drillings To Be Carried Out, - Storage Of The Core Samples In The Core Boxes To Be Provided By The Contractor, Including Laying Out And Transporting The Core Samples And Maintaining A Core Storage Facility, - Expansion Of A Borehole (Machine Borehole) To A Temporary Groundwater Measuring Point, - Later Dismantling Of The Temporary Groundwater Measuring Point, - Filling Of The Boreholes (Drilling And... Drilling Ordnance Drilling) As Well As The Dismantled Temporary Groundwater Measuring Point With Clean Gravel, Clay Pellets And Chippings, - Professional Disposal Of Excess Drilling Material And Other Waste Generated During The Work, Including Blacktops, - Cleaning Of The Areas Used For The Work
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.