GTR 104818707
Tenders Are Invited For Development Of Areas Degraded As A Result Of Mining Activities In The Cisowiec Area In Imielin.
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
104818707
Tendering Authority
Subscribe to view
Tender No
GK.271.37.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Development Of Areas Degraded As A Result Of Mining Activities In The Cisowiec Area In Imielin.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
01-12-2025
Closed
Work Detail
1) The Order Covers The Development Of Areas Degraded As A Result Of Mining Activities In The Cisowiec Area In The Imielin Commune. 2) The Task In Particular Includes Construction Works In The Field Of: • Reconstruction Of Culverts, • Construction Of A Pond, • Construction Of Hardened Surfaces, • Construction Of A Barbecue Shelter, • Construction Of A Brine Graduation Tower, • Delivery And Assembly Of A Playground With A Safe Surface, • Playground Fencing, • Delivery And Installation Of Outdoor Gym Equipment, • Construction Of A Water Supply Connection To A Brine Graduation Tower, • Construction Of Power Supply And Electrical Installation To Power The Facilities, Electrical Connectors, Park Lighting, • Assembly Electrical Connections, Park Lighting, • Construction Of Green Areas - Sowing Grass, • Planting Trees: Oak - 10 Pcs.; Weeping Willow – 10 Pcs.; Common Cherry – 10 Pcs.; Common Hornbeam – 10 Pieces; Small-Leaved Linden – 10 Pcs.; Field Maple – 10 Pcs.; Silver Birch – 10 Pcs.• Disposal Of Materials Including Storage And Disposal Fees.2. A Detailed Description Of The Subject Of The Order Is Set Out In Annex No. 7 To The Swz - Description Of The Subject Of The Order, Including Design Documentation Along With Technical Specifications For The Execution And Acceptance Of Construction Works, As Well As Bills Of Quantities. Due To The Lump Sum Settlement, Contractors Valuations Are Based On The Attached Design Documentation, Taking Into Account The Comments Contained In This Chapter Of The Swz. The Basis For Calculating The Offer Price Is The Offer Cost Estimate Prepared On The Basis Of The Design Documentation, I.E. The Contractor Should Include In The Offer Cost Estimate All Works Resulting From The Design And Other Works That, In The Contractors Opinion, Affect The Price And Were Not Included In The Design And Bills Of Quantities. The Attached Bills Of Quantities Serve An Auxiliary Function In Calculating The Offer. Contractors Do Not Attach A Full Bid Cost Estimate To The Offer Form, Only A Table Of Integrated Elements. Before Signing The Contract, The Ordering Party Will Require The Selected Contractor To Provide A Detailed Offer Cost Estimate In Paper And Editable Form, As Well As A Material And Financial Schedule. A Detailed Offer Cost Estimate Is Required, Among Other Things, To Determine The Amount Of The Planned Remuneration Indexation And Settlement Of Any Additional And Replacement Works.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
73e1d901-1374-453a-af11-a48b602e5420.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)