GTR 104760944

Tenders Are Invited For Pipelaying Construction Work – Szt - Hot Water Connection Jírovcova – Nové Vráto

ICB — International Competitive Bid Closed Eastern Europe
Tender Information
GTR Reference
104760944
Tendering Authority
Subscribe to view
Tender No
755714-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Pipelaying Construction Work – Szt - Hot Water Connection Jírovcova – Nové Vráto
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
European Union
Last Date of Bid Submission
17-12-2025 Closed
Work Detail
Pipelaying Construction Work – Szt - Hot Water Connection Jírovcova – Nové Vráto. The Subject Of The Contract Is The Construction Of A New Dn300 Hot Water Distribution System As Part Of The Gradual Replacement Of The Existing Steam Pipeline Between Cps3 Klaricova In The Cadastral Territory Of České Budějovice 3 And Czt Nové Vráto In The Cadastral Territory Of České Budějovice 4. The Implementation Includes The Disposal Of The Existing Steam Pipeline And The Construction Of A New Hot Water System In Order To Ensure Reliable Heat Supplies, Meet Legislative Requirements And Achieve Energy Savings. The Backbone Hot Water Distribution Will Be Made Of Pre-Insulated Dn300 Pipes, In The Configuration: Heating Branch In Insulation Class 2 And Return Branch In Insulation Class 1. The Construction Will Also Include The Laying Of Hdpe Protectors For Communication Cables. Connections To The Vs Hochtief Ubytovna, Vs Agrozet, Vs Rozumův Dvůr, Vs Znak Plus And Vs Dofe Cz Exchange Stations Will Be Ensured On The Route, As Well As The Preparation Of A Branch For The Vs Hochtief Betonárka And Connections For The Planned Housing Complexes In The Husova Colony Location. Payment Of The Occupation For The Special Use Of Roads And Affected Areas During The Construction Of The Hot Pipe Will Be At The Expense Of The Contractor. The Construction Will Be Implemented In Three Stages: - Stage 1: The Route From The Connection In Okružní Street (Nové Vráto) Through Trocnovská Street To Rozumov Dvor, Including The Turns To Vs Hochtief Ubytovna, The Preparation Of The Turn For The Concrete Plant, The Connection To Vs Agrozet And The Provision Of Turns For Housing Complexes. Part Of The Stage Is The Dismantling Of The Underground And Above-Ground Parts Of The Existing Steam Pipeline. The Construction Will Take Place According To The Approved Dio Coordination Situation (Approved By The Pčr On 15 January 2024), Which Forms Annex No. 4 Of This Procurement Documentation. The Contractor Will Ensure Its Installation Throughout The Construction Period Of Stage 1 And Will Lay Out All Engineering Networks Before The Start Of Excavation Work. - Stage 2: Continuation From Shaft Šo2 At Rozumova Dvor To Shaft Š5 At The Garages In Nádražní Street, Including The Line Under The Čd Railway Line And Connection To Vs Znak Plus And Vs Dofe Cz. - Stage 3: Continuation From Shaft Š5 Through Nádražní Street And A Siding Towards J. Plachty Street Ending At Cps Kláricova. The Total Length Of The New Hot Water Route Is Approximately 3,000 M. More Detailed Information On The Scope Of The Construction And The Technical Solution Can Be Found In The Technical Appendices To The Tender Documentation.
Key Value
Tender Value
242,000,000 - CZK
Tender Documents
Global Tender Document
4cea9dbd-43b4-4601-af7b-d6d20b97c183.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders