GTR 104747824

Tenders Are Invited For Electrical Wiring And Fitting Work – Ludwigslust-Parchim District - Fritz Reuter High School Center, 2Nd Ba - Modernization Of House 3, Lot 244 Electrical And Communication Technology, 19303 Dömitz

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
104747824
Tendering Authority
Subscribe to view
Tender No
757524-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Electrical Wiring And Fitting Work – Ludwigslust-Parchim District - Fritz Reuter High School Center, 2Nd Ba - Modernization Of House 3, Lot 244 Electrical And Communication Technology, 19303 Dömitz
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
16-12-2025 Closed
Work Detail
Electrical Wiring And Fitting Work – Ludwigslust-Parchim District - Fritz Reuter High School Center, 2Nd Ba - Modernization Of House 3, Lot 244 Electrical And Communication Technology, 19303 Dömitz. - Installation Of 9 New Electrical Sub-Distributions For The Supply Areas (Ground Floor, Upper Floor, Top Floor, Cafeteria/Warm-Up Kitchen, Auditorium) With Supply From The Newly Installed Main Distribution (Hv2 House 3) In The Ha Room On The Ground Floor - General Electrical Installations In All Rooms. The Installations Are Mainly Carried Out In The Ap Parapet Ducts. The Cables Are Mainly Routed In The False Ceilings And In The Lf Ducts. - Renewal Of The Complete Lighting System In All Rooms, Including External Lighting At The Entrances. Lighting In The Classrooms And Adjoining Rooms Is Controlled Via On-Site Switches With A Knx System. - Supply And Connection To Consumers Of Third-Party Trades (Heating, Ventilation, Plumbing), As Well As The 230V Connections For The Door Controls - Supply And Connection Of The Rwa System - Equipping The Barrier-Free Toilets With The Emergency Call Systems - Supplying A Sun Protection/Darkening System With Central Knx Control - Repairing The Signaling Systems In The Auditorium (Ela System And Light Dmx Systems) - Installation Of An It And Telecommunications System According To Media Development Concept - Installation Of A Centrally Controlled Clock System (Dcf) In The Hallways - Installation Of A Fire Alarm System (Full Protection With Alarm) - Installation Of A Burglar Alarm System For The Shell And Selected Rooms - Installation Of A Security Lighting System In Led Technology With A Central Battery - Installation Of The Main Potential Equalization - Installation Of Surge Protection Devices Type 1, 2 In The Distributions, Surge Protection Type 3 For The Socket Circuits - Creation Of Cable And Line Systems, Including Laying Systems, Fire Barriers - Fire Protection Measures With Documentation - Setting Up A Warm-Up Kitchen On The Ground Floor Near The Auditorium - Supplying The Elevator System In House 3 - Cabling And Setting Up External Lighting In The Selected Areas - Commissioning, Measurements And Documentation Electrical
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6c940fbc-f4b0-4e8b-b155-fd173047ad23.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders