Boiler Installations - Mura Utca - Gas Boilers And Their Auxiliary Equipment. On Behalf Of Széphő Székesfehérvár Épületfenntátó És Hőszolgáltató Zrt. (Hereinafter: Széphő Zrt.), A Concept Plan Was Prepared During The Year 2024, During Which It Was Examined And Selected Which Energy Sources Could Be Used For The Development Of The New District Heating District On Mura Street. Based On The Owners Decision, In The First Phase Of Integrating The New Heating District Into The System, 1 100-120 Kw And 2 470-510 Kw Stationary Condensing Gas Boilers, 3 5 M³ Heat Storage Tanks And 1 3 M³ Make-Up Water Tank In The Planned Mechanical Room, As Well As A Minimum 31.32 Kw Nominal Power On The Flat Roof Above The Building After The Roof Renovation A Solar Panel Field Is Placed. Belonging To The Location Of The Boilers, 2 Heat-Insulated Dn300/400 And Dn110/210 Chimneys With A Discharge Height Of 12.00 M Will Be Installed On The West Facade To Ensure Flue Gas Drainage, Enclosed In A Lattice Support Frame Structure. The Boiler House Will Be Designed In Such A Way That During The Expected Infrastructural Development Of The Area Near The Site, It Can Be Expanded To Serve It Up To 2Mw, And During The Expansion, Renewable Energy (Pellet Heating) Can Also Be Integrated Into The System. The Detailed Quantities Can Be Found In The Planned Unpriced Budget, Technical Information And Its Annexes.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.