Construction Of An Approx. 13.5 Km Long 110 Kv Lattice Mast Double Line Between The Has-Ling Branch Mast And The Planned Yspertal Substation With A Total Of 48 Support Points. Construction Of A New Branch Mast In The Existing Uw-Erlauf - Uw Am Schuß Line. Production Of Portal Tensioning For 5 Line Systems And 3 Earth Cables In Stockerau In The Summer Of 2026 Manufacture Of Temporary Pipelines At Uw Stratzdorf In Autumn 2026. Ropes, Fittings And Grounding Material Are Provided By The Client, Lattice Masts Are Included In The Contractors Scope Of Delivery.