Plasterboard Works – Mhh - K06 - Bu Package Ii - Trade: Fire Protection Ceiling (Main Measure). The Project Management Department Gb Vi Is Tasked With The Operational Implementation Of The Fire Protection Renovation Measure, 2Nd Stage - Building K6 - Bu Package 2. According To The Expert Assessment, There Are Significant Risks In Building K06, Particularly With Regard To The Protection Objectives Of Enabling People To Be Rescued And Preventing The Spread Of Fire And Smoke. Against This Background, Immediate And Immediate Action Is Required To Ensure The Continued Use Of The K06 Ward And To Ensure Undisturbed Clinical Operations. The Aim Of The Measure Is To Upgrade The Fire Protection Of The Vertically Stacked Elevator Vestibules In Nodes A And C. This Is Intended To Sustainably Improve The Escape Route Situation. As Part Of This Award Procedure, The Services Of The Drywall Construction Work Fire Protection Ceiling Trade (Main Measure) Will Be Put Out To Tender In Particular. These Include, Among Others: Drywall Nodes A And C: Construction Site Equipment, Fire Protection Ceiling - Suspended-Foldable-Slidable, Partitioning Niche Elevators, Built-In Parts. In Order To Participate In The Procurement Process, Knowledge And References In The Ongoing Operation Of Ward Buildings Are Required. This Knowledge Must Be Demonstrated And Documented In The Form Of References That Are Directly Related To The Advertised Work. Important For All Bidders: The Work Will Be Carried Out Step By Step In The Individual Construction Phases. In Total There Are 15 Pieces That Are Processed One After The Other. Continuous Work Is Therefore Not Intended And Not Possible.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.