Tenders Are Invited For Development Of Investment Projects Under Two Specific Positions: Specific Position No. 1: Water Supply To The Hamlet Baba Stana, Village Oreshak Specific Position No. 2: Water Supply To The Area Aldishki Rut, Town Of Troyan
Tenders Are Invited For Development Of Investment Projects Under Two Specific Positions: Specific Position No. 1: Water Supply To The Hamlet Baba Stana, Village Oreshak Specific Position No. 2: Water Supply To The Area Aldishki Rut, Town Of Troyan
Op1 - Water Supply Of The Baba Stana Hamlet, Oreshak Village It Is Planned To Develop An Investment Project For The Water Supply Of Mach. Baba Stana From The Internal Water Supply Network Of The Village Of Oreshak, A Bunker Pumping Station (Bps) With A Drawing Tank (Cr) And A Push Water Pipeline From A Bunker Pumping Station To A Pressure Tank (Pr) Baba Stana. The Supply Of The Čr And Bps Will Be Carried Out From The Existing Street Water Supply, And It Is Necessary To Provide For The Reconstruction Of The Water Supply In The Section From The Main Street Of The Village Of Oreshak To The Place Of The Bps. The Route Of The Push Water Pipeline From Bps To Nr Baba Stana Should Be Provided In The Bank Of The Road To The Hamlet. Two Pumps Should Be Installed In The Bunker Pumping Station: One Working And One Spare. The Following Project Parts Should Be Developed: Water Supply; Constructions; Geodesy; Road; Temporary Traffic Organization; Electro, Kip And A; Fire Safety; Construction Waste Management Plan; Pbz, Detailed Cc And Ccs In All Parts. Op2 - Water Supply To The Area Aldishki Rut, Town Of Troyan It Is Planned To Develop An Investment Project For The Water Supply Of The Aldishki Rut Locality, By Connecting It To The Internal Water Supply Network Of The City Of Troyan, By Means Of The Existing Pumping Station (Ps) Balabansko. The Project Should Provide For: •Installation Of A Second Group Of Pumps At The Balabansko Station •Construction Of A Push Water Pipeline From The Station To The Pressure Tank Aldishki Rut •Construction Of A New Water Distribution System To End Users • Installation Of Water Meter-Reinforcement Units On All Deviations The Following Project Parts Should Be Developed: Water Supply; Constructions; Geodesy; Road; Temporary Traffic Organization; Electro, Kip And A; Fire Safety; Construction Waste Management Plan; Pbz, Detailed Cc And Ccs In All Parts.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.