Data Network Modernization Is Essential To Optimize The Departments Network Infrastructure, Ensuring A Efficient Operation And In Accordance With Current Requirements. Thus, For The Correct Execution Of The Project, The Implementation Of The Following Works Is Required; Laying And Connection Of Points Category 6 Utp Network, Including Certification Through Eiatia 568 Tests, Which Will Guarantee Optimal Performance And Compliance With International Standards. Installation And Electrification Of An 18U, 19” Wall Rack, Necessary For The Organization And Protection Of Network Equipment, B Exposed Channeling Using Dlp Molding, Pvc Conduit Or Emt, As Appropriate, For A Safe And Orderly Installation, C Transfer And Reconnection Of 6-Strand Multimode Optical Fiber, Ensuring Continuity Of Service And Integrity Of The Existing Network.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.