1. The Subject Of The Order Is The Execution Of Construction Works Consisting In The Construction Of A Relaxation Zone In The Town Of Gołębiew Stary On Plots With Registration Numbers 245 And 252, District 0008 Gołębiew As Part Of The Implementation Of The Project Entitled Expanding The Recreational And Sports Offer By Building A Relaxation Zone In Gołębiewo Stary.2. Part I Of The Order - Construction Of The Pitchincludes Only The Construction Of A Beach Volleyball Pitch Along With Net Catches And Pitch Equipment.3. The Detailed Description Of The Subject Of The Order Is As Follows:1) For Part I:A) Technical Design - Architecture Industry - Annex No. 1A To The Swz;B) Simplified Technical Documentation - Annex No. 1B To The Swz;C) Technical Design - Electrical Industry - Annex No. 1C To The Swz;D) Technical Design For The Notification Of Works - Annex No. 1D To The Swz;E) Bill Of Quantities - Annex No. 1E To Swz; (Note: Due To The Lump-Sum Nature Of The Remuneration, The Ordering Party Provides The Bill Of Quantities As A Illustrative And Informational Material. The Basis For Determining The Offer Price Is Ultimately The Technical Documentation And The Draft Contract) F) Draft Contract - Annex No. 5A To The Swz.4. Guarantee And Warranty For Defects: Guarantee And Warranty: 1) The Ordering Party Requires The Contractor To Provide A Guarantee And Warranty For Defects For The Completed Construction Works For A Period Of At Least 24 Months From The Date Of Final Acceptance Of The Works. (The Final Date Of The Warranty And Warranty For Defects Will Result From The Contractors Offer).2) The Warranty And Warranty Covers All Elements Made By The Contractor As Part Of The Implementation. Of The Subject Order, In Particular: A) Construction And Assembly Works; B) Installation Works; C) Assembly Works; D) Completed Installations; E) Delivered And Installed Devices And Equipment Elements As Part Of The Execution Of The Subject Of The Order.3) The Warranty Covers: A) Removal Of All Defects Inherent In The Item At The Time Of Receipt And During The Warranty Period; B) All Costs Related To The Performance Of Warranty Repairs, In Particular The Costs Of Materials And Labor As Well As The Costs Of Travel To The Place Of Repair, Transport, Delivery Of Construction Products And Equipment; C) Costs Of Removing Any Damage, Defects And Defects That Occurred As A Result Of Materials Used By The Contractor That Had A Hidden Defect.5. Information About The Local Visition: Contractors May Become Acquainted With The Conditions Of Contract Execution At The Site Of Construction Works After Prior Notification To The Ordering Party Of The Planned Date Of The On-Site Visit. The Contractor Wishing To Carry Out An On-Site Visit Must Inform The Ordering Party In Advance Via The Purchasing Platform Or To The E-Mail Address Zamowienia@Gminakutno.Pl. The Ordering Party Will Set A Date For The Contractor To Carry Out An On-Site Visit. At The Same Time, The Ordering Party Informs That D
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.