Wastewater Treatment Plant Construction Work – Change In Wastewater Treatment Technology. 1. The Subject Of The Order Is The Design And Execution Of Construction And Installation Works In Order To Change The Sewage Circulation In Biological Chambers No. 9 - 12 From Parallel To Serial While Modifying The Internal Circulation. The Subject Of The Task Is To Carry Out The Necessary Design Work And Work On The Existing Facility (Biological Chambers 9 - 12), With Maximum Use Of The Existing Sewage Circulation System And Internal Circulation, To Ensure Serial Sewage Circulation. The Change In Sewage Circulation And Internal Circulation (Sewage Containing Activated Sludge) Should Enable A Relatively Easy Return To The Currently Existing Sewage Circulation System And Circulation Inside The Chambers In The Event Of Unsatisfactory Results Of The Technology Change. A Detailed Description Of The Subject Of The Order In The Form Of A Functional And Utility Program (Hereinafter Referred To As Opz) Is Specified In The Annex To The Swz. 2. The Initial Contract Validity Period Indicated In The Announcement Is Indicated Due To The Mandatory Field In This Announcement. The Actual Starting Date Of The Contract Will Be The Date Of Conclusion Of The Contract. Completion Date: May 31, 2026.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.