Installation Of Traffic Lights – Framework Agreement For Installation Of Traffic Control Systems 2026 - 2030. The Work Mainly Consists Of: A. Removing And Disposing Of Existing Traffic Control Devices, Including Foundation; B. Removal And Disposal Of Specified Cabling, Lanterns, Attachments And Other Furniture; C. Delivery, Installation And Delivery Of Furniture Ready For Use; D. Supplying, Laying And Delivering Cables And Pipes Ready For Use; E. Supplying, Installing, Connecting And Delivering Detection Loops Ready For Use; F. Installing, Connecting And Delivering The New Traffic Control Machines Ready For Use; G. Supplying, Laying, Installing And Delivering A (Fiberglass) Tube Ready For Use; H. Supplying, Laying, Installing And Delivering A Casing Pipe Ready For Use; I. Measuring And Taking Care Of The Revision; J. Provide Traffic Measures And Provide Traffic Controllers In Accordance With The Traffic Plan To Be Drawn Up; K. Organizing And Ensuring The Reporting Of The Construction Meetings Together With The Contractor Of Specification Vra 2021-1 (The Contractor Of Specification Bi 2026-1 Is Leading In This): L. Maintaining The Work Completed For 52 Weeks After Completion Of A Partial Assignment. The Framework Agreement Expires When A Turnover Of € 4,500,000 Excl. Vat Has Been Achieved.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.