• Construction Of A Separate Sewerage System In Mussenstraat. The Existing Sewerage Will Be Removed, And 2 New Lines Will Be Constructed, 1X Rwa And 1X Dwa. • The Dwa Pipe Will Collect In A Pump Well That Pumps The Waste Water To The Existing, Already Renovated System Further North In The Mussenstraat. • The Rwa Will Be Connected To The Existing Canals, Which Will Be Reprofiled. These Will Ultimately Drain To The Os153a Watercourse. An Overflow Wall With A Passage Will Be Placed In The Canals So That They Drain Slowly To The Watercourse.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.