Manual Digging Of Soil In Sloped Trenches Up To 2 M Deep Without Fasteners, Soil Group: 2 (Manual Digging Of Soil For Laying Cables), Manual Digging Of Unsloped Pits Up To 0.7 M Deep Without Fastenings For Supports And Columns, Soil Group: 2, Construction Of General-Purpose Concrete Foundations For The Bottom Of The Columns, Volume: Up To 3 M3, Installation Of Anchor Bolts: Up To 1 M In Length By Placing And Tightening In Ready-Made Sockets, Installation Of Steel, Intermediate, Free-Standing, Single-Post Supports, Mass: Up To 2 T (Installation Of 2 Light Poles H=9 M, D=100/89 Mm), H9 Meter Double Arm Lighting Cone Support (Galvanized + Powder Coated) (Arm Length 850Mm), Lampa Led, 10W 6500K, Underground Laying Of Corrugated Pvc Pipes For Cable Protection, Diameter: 50 Mm, Polyethylene Water And Gas Pipe With High Flexibility, Wide Pressure Range, Meeting Azs 806-2-2014 En 12201-2 Standards: Diameter 50 Mm, Wall Thickness 2.4 Mm, Pe 100, Pn 8, Cable Up To 35 Kv In Drawn Pipes, Blocks And Boxes, Mass Of 1 M Cable, Kg, Up To:1, 0.6/1.0 Kv Power Cable 2Х16, A Device Or Apparatus, Avtomat Açar 5Sl 6363 - 7 C 63 6Ka, Construction Of Paving And Leveling Layers Of Foundations: Sand-Gravel Mixture, Coarse Sand (Thick=3 Cm), A Mixture Of Sand And Gravel
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.