Drilling of a New Borehole for the Bilcil Village Sool Region Information Official Details Payment Condition No Water, No Payment Inviting Authority Bilcil Community Development Coordinate Point Northing:- 9°4044" Easting:- 47°5304" Project Location Bilcil Area, Sool Region, Northeast State of Somalia Target Borehole Depth 400 Meters Tender Closing Date (Deadline) 30/November/2025 Tender Submission Email
[email protected] For the Drilling of a New Borehole for the Bilcil Village Sool Region, Northeast State of Somalia Introduction and Strong Invitation BILCIL COMMUNITY Development WELCOMES WATER CONTRACTORS! The Bilcil Community Development consists of unified citizens, both local and diaspora, who, as volunteers, supported this project after deeply recognizing the severe water scarcity in the Bilcil area. The sole purpose of the funds collected is to provide the community and livestock with a clean, permanent water source and a sustainable solution to the water shortage. INVITATION: Bilcil Community Development honorably invites all drilling contractors with extensive experience and modern equipment, registered with the Ministry of Water of the Northeast State of Somalia to submit competitive bids for the Drilling of a New Water Borehole in this area. 2-Scope of Work (SOW) and Technical Requirements The Contractor is expected to fully implement all activities, adhering to the highest standards, while strictly observing the fundamental condition of No Water, No Payment. A. Drilling and Water Testing: · Hydrogeological Survey: A complete survey must be conducted before drilling. · Drilling Depth: Drilling must reach the target depth of 400 Meters (400m), using modern equipment (Rotary Rig/DTH). o Stop Drilling Clause: If sufficient water (minimum 10m³/hour) is found at less than 400m, drilling shall stop, and payment will be made for the actual depth drilled. · Well Development & Cleaning: The well must be developed and cleaned (using Compressor and Foam) until the water is clear/white. · Pumping Test: A mandatory 24-hour Pumping Test must confirm a minimum sustainable yield of 10m³ per hour. B. Critical Payment Condition (No Water, No Payment): · If the borehole fails to yield sufficient water ( less than 10m³/hour) that is suitable for human consumption, the company shall receive no payment. Payment is strictly conditional upon the delivery of a sustainable and qualified water source. C. Installation: · High-quality Casing & Screen Pipes and Gravel Pack (as per BOQ specifications) must be installed. 3- Work Plan (TECHNICAL PROPOSAL REQUIREMENT) The Bidder must submit a detailed Work Plan, which will be evaluated in the technical phase. The plan must clearly indicate the activities and timeline Tender Link : https://somalijobs.com/tenders