GTR 104163141

Tenders Are Invited For Architectural, Engineering And Planning Services – Request For Tender: Total Responsibility Planning (Kvs) Of The New Preparation Kitchen Of Kainuu Central Hospital

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
104163141
Tendering Authority
Subscribe to view
Tender No
726656-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural, Engineering And Planning Services – Request For Tender: Total Responsibility Planning (Kvs) Of The New Preparation Kitchen Of Kainuu Central Hospital
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
23-11-2025 Closed
Work Detail
Architectural, Engineering And Planning Services – Request For Tender: Total Responsibility Planning (Kvs) Of The New Preparation Kitchen Of Kainuu Central Hospital. The Kainuu Welfare District Is Building A New Manufacturing Kitchen In The Area Of ​​The Kainuu Central Hospital. The Total Scope Of The Project Is About 1700 Brm2 And The Useful Area About 1340 Useful M2. The Building Will Be Implemented As An Extension Of The Existing Logistics Terminal (G Building). In Addition To A New Preparation Kitchen, The Project Includes A Milk Kitchen, Additional Storage And Operational Spaces For The Distribution Of Nursing Supplies And Material Services, As Well As The Necessary Changes To The Yard Areas Surrounding The Building. The Procurement Covered By This Request For Tender Includes The Complete Overall Responsibility Planning Of The New Manufacturing Kitchen In Accordance With The Attached Material And Space Program Of The Request For Tender. The Procurement Includes The Design And Construction Phase, As Well As The Design Tasks And The Designers Supervision Tasks During The Warranty Period. With Total Responsibility Planning, The Customer Ensures In Particular That • The Responsibility For Managing And Coordinating The Whole Of The Design Work And The Feasibility Of The Project With The Approved Cost Estimate Is Unambiguous • The Reliability Of Delivery Of The Design Work And The Ability To Innovate Are At An Excellent Level. In Overall Planning, The Customer Enters Into A Design Contract Only With The Main Designer, And The Work Group Responsible For Overall Responsibility Planning Organizes Its Contractual And Invoicing Relationships Internally As It Sees Fit. In The Bidding Process, The Customer Chooses The Total Responsibility Design Planning Group That Submitted The Cheapest Offer, Which Meets The Minimum Requirements Set For The Procurement. The Planning Starts Immediately After The End Of The Appeal Period Of The Procurement Decision. The Planning Work Must Progress And Be Completed In Such A Way That The Construction Can Be Put Out To Tender In May 2026 At The Latest. The Goal Is That The Earthworks, Foundation And Substructure Work Will Be Done During The Thaw In 2026, And The Estimated Completion Time Of The Building Is At The End Of 2027. The Form Of Construction Of The Project Has Not Been Decided. Description Of Procured Services The Main Content Of The Overall Responsibility Planning Is The Complete Planning Of The New Manufacturing Kitchen In Accordance With The Attached Material And Space Program Of The Request For Tender. The Task Includes The Design And Construction Phase As Well As The Design And Supervision Tasks Of The Warranty Period. The Work Includes Finding Out And Supplementing The Necessary Initial Data During Planning. Total Responsibility Planning Includes The Following Tasks: • Main Design Ps 18 (Rt 103254) • Architectural Design Ark18 (Rt 103253) • Interior Design Sis12 (Rt 10-11192) • Structural Design Rak18 (Rt 103087) • Geodesign Geo12 (Rt 10-11127) • Building Engineering Design Tate18 (Rt 10-11290) • Lighting Design Val12 (Rt 10-11174) • Acoustics Design Aku12 (Rt10-11185) • Fire Engineering Design • Traffic Design • Yard And Landscape Design • Elevator Design • Moisture Management Coordinator (Rt 103333, Rt 84-11166, Rt 103447) • Information Model Coordination • Cost Accounting All Fields Design Tasks Also Include • Supervision Work And Inspections Of Designers During Construction, Plans
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5d5f167f-c904-48f4-9649-ce04a5d4b2aa.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders