Manual Cleaning Of The Surfaces Of The Facades From The Floor And Wooden Beams From Perchlorvinyl And Oil Paints, Improved Painting With Polyvinyl Acetate Water Emulsion Compositions: Plastered Walls, Demolition: Build Walls From Small Blocks, Removal Of Curbstones: On A Concrete Base, Manual Digging Of Soil In Trenches Up To 2 M Wide And Up To 2 M Deep With The Application Of Fasteners, Soil Group: 2 (For 20 Poles), Manual Filling Of Ditches, Pits And Pits, Soil Group: 2, Installation Of Reinforced Concrete Beams (Extensions) On Supports And Poles: Single, Support Or Pole Height Up To 8.5 M, Aluminum Light Pole, H=4M, Reinforced Concrete Plate Pt1 09-05 (For Fixing The Pole), Lamp On Bracket (Ceiling), Ceiling Ip 65 Led, , Removal Of Tiles And Wall Coverings: Marble (Removal Of Ceramic Granite), Improved Plastering On Stone With Cement-Lime Solution: Walls, Wall Cladding With Tuff, Limestone, Herringbone Tiles Up To 40 Mm Thick, Number Of Tiles Per 1 M2: Up To 6 (Facade Wall), Aglay Tiles, Thickness 40 Mm
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.