1. The Subject Of This Order Is Construction Of Renewable Energy Installations In Public Buildings And Facilities In The Panki Commune. Implemented Under The European Funds For Silesia 2021-2027 Program Priority Ii European Funds For Green Development Measure 02.06 Renewable Energy Sources - Projects Other Than Grant And Umbrella Projects, In Particular: 1.1. Preparation Of Technical/Design Documentation Along With Obtaining Legally Required Arrangements, Consents And Permits, As Well As Opinions, Including Building Permits, Or Reporting The Construction Or Performance Of Other Construction Works - If Required By Law, Fire Protection Arrangements Necessary To Implement The Subject Of The Order. Number Of Copies Of The Document. Technical / Design - 3 Setsthe Developed Design Documentation Must Be Consistent With The Do No Significant Harm Principle - The Dnsh Principle, Analysis Of Compliance With The Do No Significant Harm (Dnsh) Principle, Within The Meaning Of Art. 17 Of Regulation (Eu) No. 2020/852, Taking Into Account The Indicated Scope Of Work And The Nature Of The Investment. The Design Study Must Also Include The Preparation Of The Opening Report/Final Report, Describing The Method Of Planning, Implementation, Implementation, Monitoring And Settlement Of The Investment In Accordance With The Dnsh1.2 Guidelines. Delivery And Installation Of Energy Storage Facilities With Accessories For Photovoltaic Installations: A) Panki Commune Office - Ul. Tysiąclecia 5, 42-140 Panki; Plot Id: 240606_2.0011.254/5 Photovoltaic Installation For The Needs Of The Commune Office (Installation Of Energy Storage Facilities - Basement Of The Office Building; Pv Installation On The Roof Of The Building), B) Panki Commune Office - Ul. Tysiąclecia 5, 42-140 Panki; Plot Id: 240606_2.0011.254/5 Photovoltaic Installation For A Carport With An Electric Car Charging Station (Installation Of Energy Storage Facilities - Basement Of The Office Building; Pv Installation, Carport With An Electric Car Charging Station), Conducting Construction Works In Accordance With The Principle (Dnsh) Do No Serious Harm .1.2.1. Construction Of A Photovoltaic Installation Cable Line From The Car Port To The Basement Of The Building. Commune Office, 1.2.2. Connection/Configuration Of Energy Storage With Photovoltaic Installations, 1.2.3. Delivery And Installation Of Hybrid Inverters For Photovoltaic Installations Along With Accessories;1.2.4. Execution Of Construction Works - Excavations, Cuttings, Filling Of Defects In Walls, Ceilings And Floors, Repair Of Plasters, Facades And Its Insulation, Sealing The Roof Covering After Cable Penetrations; 1.2.5. Carrying Out Reconstruction Works; 1.2.6. Carrying Out Control Measurements, Carrying Out Installation Performance Tests, Commissioning And Adjusting The Installation;1.2.7. User Training;1.2.8. Preparation Of The User Manual;1.2.9. Preparation And Submission Of Complete Application Documents For Connecting A Photovoltaic Installation With
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.