Quotation are invited for Supply of Construction Materials and Construction Work-Wau Office 1.0 Supply Water for the Project Site Activity (Approx. 15,000 Liters of Water for the Ls 1.0 Project) B Excavation (7.12 Cubic) 2.0 Labour Cost for Foundation Trench 1.0 Excavation Ls C Site Clearance before and after Job. 3.0 Labour Cost for Site Clearance and Disposal of Waste to a Designated Location Away from Site Ls 1.0 Recommended by the Zd Field Staff D Foundation Works A)) Plinth Wall (16.7 Cubic) 1.0 Burnt Clay Bricks Pcs 4,160.0 2.0 Cement Bag 16.0 3.0 Sand m3 3.0 B) Backfill 4.0 Supply Good Quality Murram/Gravel (18m3/Trip) Trip 1.0 C) Oversite Rcc Slab (32 Cubic) 5.0 Supply a142 Brc Reinforcement Mesh (48m X 2.4m)/Roll Roll 1.0 6.0 Cement Bag 200.0 7.0 Sand m3 14.0 8.0 Coarse Aggregate m3 28.0 9.0 Damp Proof Membrane (Dpm) Roll Roli 5 10.0 Labour Cost for Foundation Works (25% of Materials Cost) to Satisfaction of Zd Project Engineer/Field Staff 1 Ls E Walling 1.0 Cement -Tororo or Equivalent (32.5n Grade) Bag 63 2.0 River Sand (Coarse/Rough) - 8m3/Trip Trip 2 3.0 River Sand (Soft)- 8m3/Trip Trip 2 4.0 Shaped Stone Pcs 1,000 5.0 Dead Stone Trip 3 6.0 Coarse Aggregate (4m3/Trip) Trip 1 7.0 Burnt Clay Bricks (200x100x90mm) Pcs 30,100 8.0 Clay Soil/Mortar/Muna (24m3/Unit) Unit 6 9.0 4m Length Pcs 10 100mm Dia. Teak Poles of 6m 10.0 25 Length Pcs 11.0 2200mm X 1000mm Fabricated Ms Metallic Door Lockable in & Out with Vent, 2 Coats of Red-Oxide 2 Undercoat. Pcs 12.0 1400mm X 1000mm Fabricated Double Sash Ms Window Lockable Inside with 300mm Vents, Apply 2 Coats of Red-Oxide Undercoat Paint. 2 Pcs 13.0 35.5x9.5cm Ventilation Bricks/Blocks. Pcs 4 14.0 Labour Cost for Walling Works (25% Of Materials Cost) to Satisfaction of Zd Project Engineer/Field Staff 1 Ls F Roofing 1.0 6x2 Hardwood Timber of 4m Length Pcs 15 2.0 4x2 Hardwood Timber of 4m Length Pcs 55 3.0 3x2 Hardwood Timber of 4m Length Pcs 42 .0 9x1 Hardwood Timber of 4m Length Pcs 10 5.0 5" Ordinary Nails Kg 20 6.0 4" Ordinary Nails Kg 15 7.0 3" Ordinary Nails Kg 10 8.0 2" Ordinary Nails Kg 2 9.0 Umbrella Cap Roofing Nails Kg 15 10.0 Rubber Washers (Uniform Color) Pkt 10 11.0 Ridge Cap (2m Length) Pcs 6 12.0 g28 Super Eco Pre-Painted Galvanized Iron Sheet (3m X 0.9m) Pcs 28 13.0 Hoop Iron (25kg/Roll) Roll 3 14.0 Labour Cost for Walling Works (25% of Materials Cost) to Satisfaction of Zd Project Engineer/Field Staff 1 Tender Link : https://comms.southsudanngoforum.org/c/tenders
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.