1. The Subject Of The Order Is The Delivery And Installation Of Energy Storage Facilities, Which Will Be Located In Facilities Located In The Barczewo Commune.2. Scope Of The Project: 1) Village Community Center - Low-Voltage Energy Storage System With A Capacity Of 14 Kwh, Based On Lithium-Iron-Phosphate Battery Technology. It Was Planned To Install 2 Battery Modules With A Capacity Of 7 Kwh Each. Storage Capacity: 7 Kwh.2) Osp Barczewko - Low-Voltage Energy Storage System With A Capacity Of 15 Kwh, Based On Lithium-Iron-Phosphate Battery Technology. It Was Designed To Install 3 Battery Modules With A Capacity Of 5 Kwh Each. Storage Power: 7 Kwh. 3) Osp Barczewo - Low-Voltage Energy Storage System With A Capacity Of 15 Kwh, Based On Lithium-Iron-Phosphate Battery Technology. It Was Designed To Install 3 Battery Modules With A Capacity Of 5 Kwh Each. Storage Capacity: 7 Kwh.4) Osp Ramsowo - Low-Voltage Energy Storage System With A Capacity Of 10 Kwh, Based On Lithium-Iron-Phosphate Battery Technology. It Was Planned To Install 2 Battery Modules With A Capacity Of 5 Kwh Each. Storage Power: 7 Kwh3. The Scope Of Work Should Be Performed Based On The Technical Designs Attached To This Procedure.4. The Contractor Is Obliged To Ensure That The Staff Does Not Perform Work In Conditions That Are Dangerous, Harmful To Their Health, Or That Do Not Meet Sanitary Requirements - Compliance With Health And Safety Regulations - Regulation Of The Minister Of Infrastructure Of February 5, 2003 On Occupational Health And Safety During The Performance Of Construction Works.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.