Tenders Are Invited For Reconstruction Of The Sports Field At The Boarding House Of The Mechanical School Complex In Głubczyce

Tender Detail

104050831
OR.272.41.2025
Self-Funded
Tenders Are Invited For Reconstruction Of The Sports Field At The Boarding House Of The Mechanical School Complex In Głubczyce
NCB
central europe
European Union
14-11-2025

Work Detail

The Reconstruction Of The Playing Field At The Dormitory Of The Mechanical School Complex In Głubczyce Includes The Following Works: 1. Construction Works,2. Construction Works On Sports Fields,3. Works On Various Surfaces,4. Pedestrian Road Surface Works,5. Construction Works On Pedestrian Paths,6. Installing Fences, Fences And Protective Equipment,7. Erecting Fences,8. Ground Drainage Works,9. Drainage Accessories,10. Drainage. A Detailed Description Of The Subject Of The Order Is Included In The Documentation Constituting Annexes To The Swz. The Ordering Party Allows Equivalent Offers: The Manufacturers Names/System Names Used In The Design Documentation Are Not Intended To Give Preference, But To Indicate The Expected Features/Technical And Quality Parameters Of Products, Devices, Etc., Which Are Important From The Point Of View Of The Operation Or Use Of The Facility As A Whole, In Accordance With Its Intended Use Specified In The Documentation. The Names/Parameters/Features/Properties Regarding The Equivalence Of Products/Devices Given In The Names/Parameters/Features/Properties Are The Minimum Values ​​That The Proposed Products/Devices Must Meet. Use Other Than Those Indicated In The Above-Mentioned Documentation Or The Table Below Is Acceptable Provided That They Have Parameters/Features/Properties That Are The Same Or Better Than The Reference Products In Terms Of Functionality, Technical, Quality And Aesthetics - They Must Meet The Assumptions Adopted In The Above-Mentioned. Documentation And Applicable Standards And Regulations. Changing Any Of The Devices, Elements, Materials, Etc. Mentioned In The Documentation Must Take Into Account All Technical Parameters That Are Important From The Point Of View Of The Operation Of The Facility As A Whole, As Well As Taking Into Account The Specific Architectural And Construction Limitations Of The Facility. The Materials And Devices Used In The Project Were Coordinated Across Industries (Also In Terms Of Weight, Dimensions, Noise, Power Supply, Automation, Control, Etc.). All Devices Should Ensure Mutual Compatibility, Also With Installations And Devices From Other Industries. The Contractor Is Then Obliged To Demonstrate That The Materials, Devices Or Technologies Used By Him Meet The Expectations Specified By The Ordering Party By Submitting Appropriate Documents, Calculations, Opinions, Etc. Only The Use Of Mixed Solutions - Devices, Materials From Different Systems (Suppliers) Is Not Allowed. If The Contractor Proposes Works Other Products/Equipment, Etc. Than Those Selected By The Designer, The Contractors Responsibilities At The Implementation Stage - If Necessary - Will Include Re-Calculations, Checking Their Selection, Re-Coordinating Between Industries And Adapting And Agreeing On The Documentation.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 62109af0-1dbd-4413-bdfa-473f42f6aec9.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail