GTR 103996306
Tenders Are Invited For Construction Work – Design And Execution Of Works For The Task Titled: Construction Of A Passage Under The Tracks With Ramps For Emergency Use. Warszawa Gołąbki On Line No. 3 As Part Of The Project: Construction Of A Passage Under The Tracks With Ramps On The Warszawa Gołąbki Line No. 3
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
103996306
Tendering Authority
Subscribe to view
Tender No
716825-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work – Design And Execution Of Works For The Task Titled: Construction Of A Passage Under The Tracks With Ramps For Emergency Use. Warszawa Gołąbki On Line No. 3 As Part Of The Project: Construction Of A Passage Under The Tracks With Ramps On The Warszawa Gołąbki Line No. 3
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
07-11-2025
Closed
Work Detail
Construction Work – Design And Execution Of Works For The Task Titled: Construction Of A Passage Under The Tracks With Ramps For Emergency Use. Warszawa Gołąbki On Line No. 3 As Part Of The Project: Construction Of A Passage Under The Tracks With Ramps On The Warszawa Gołąbki Line No. 3. The Subject Of The Order Is The Design And Execution Of Works For The Task Titled: Construction Of A Passage Under The Tracks With Ramps For Emergency Use. Warsaw Gołąbki On Line No. 3 As Part Of The Project: Construction Of A Passage Under The Tracks With Slipways On The Warsaw Gołąbki Line On Line No. 3. The Entire Subject Of The Order Includes The Preparation Of The Following Elements: 1) Design Documentation, Including: A) Construction Design Together With The Authors Supervision, B) Obtaining A Building Permit And Other Necessary Administrative Decisions, C) Development Of An Executive Design, D) Preparation Of As-Built Documentation, Including Geodetic Documentation As-Built, 2) And Works In The Scope Of: A) Surface And Subgrade, B) Railway Traffic Control Devices (Srk), C) Telecommunications Devices And Systems, D) Traction Network With Power Supply, E) Electrical Power Equipment And Systems Up To 1 Kv, F) Engineering Structures With Accesses, Ramps, G) Platforms With Ramps And Elevators, Shelters, Small Architecture, H) Accesses, Parking Spaces, I) Geology. 3) Works Involving The Reconstruction And Construction Of Environmental Protection Facilities. 4) Carrying Out The Conformity Assessment Process Of The Infrastructure Structural Subsystem (In The Scope Of Construction Of Platforms) In The Part Covered By The Scope Of The Order At Each Stage (Design, Construction And Final Tests Of The Subsystem) And Submitting The Appropriate Ec Verification Declarations And Ec Verification Certificates For The Subsystem. A Detailed Description Of The Subject Of The Order Is Presented In The Functional And Utility Program (Ffu) Constituting Volume Iii Of The Swz. Information Supplementing Section 5.1.3 Estimated Validity Period: Order Implementation Period: 49 Months From The Date Of Conclusion Of The Agreement In Accordance With § 1 Of The Terms And Conditions Of The Agreement, Contained In Volume Ii Of The Swz. 1) Completion Of All Works And Works Covered By The Subject Of The Order (Subject To The Point Below), Including Providing The Ordering Party With Complete As-Built Documentation And Providing The Ordering Party With A Set Of Documents Related To The Certification Process, Including Submitting Complete Applications Enabling Obtaining Permission To Operate The Structural Subsystem (In The Event That The Ordering Party Receives A Decision Of The President Of Utk On Such Necessity) - 41 (Forty-One) Months From The Date Of Conclusion Of The Agreement, 2) Providing The Ordering Party With Permission To Operate The Structural Subsystem Operation Of Structural Subsystems, In Accordance With The Railway Transport Act, If The Ordering Party Receives A Decision From The President Of Utk On Such Necessity - No Longer Than Within 8 (Eight) Months From The Date Of The Last Final Acceptance By The Ordering Party.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
91ff92ce-3074-4049-8205-c433bf3a0804.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.