Request for proposals for Provision of End-To-End Design and Civil Works Consultancy Services Location: Kayonza Deadline: Friday, 07/11/2025 23:59 Request for Proposal (RFP) Service: Provision of End-to-End Design and Civil Works Consultancy Services REQUEST FOR PROPOSAL (RFP) Provision of End-to-End Design and Civil Works Consultancy Services RFP Reference: ZRW-USG-1RW3-2025 Date Issued: 28th October 2025 Submission Deadline: 7th November 2025 1. Introduction Zipline Rwanda Ltd invites qualified and experienced consultancy firms to submit proposals for the provision of end-to-end design and civil works consultancy services. The selected firm will provide comprehensive architectural, civil, structural, mechanical, and electrical engineering design advisory services in line with Rwandas Green building minimum requirements system for upcoming Zipline infrastructure projects. The consultancy will be expected to provide a turnkey solution from design peer reviews through to construction documentation, technical supervision, and project handover. 2. Project Overview The scope of this engagement covers the design peer review and construction oversight of Ziplines facilities, which may include: Warehousing and logistics infrastructure Office and operations buildings Drone launch and recovery zones Utility and support systems (power, HVAC, water, Septic tank etc.) The selected firm will collaborate with Ziplines internal project and procurement teams to ensure the designs are cost-effective, compliance to Rwandan construction rules, standards, and legislation, sustainable, and aligned with Ziplines operational standards. 3. Scope of Work The consultancy firm will be responsible for delivering the following key services: A. Preliminary and Conceptual Design While the concept design and general layout will be prepared internally by Zipline Rwanda Ltd, the consultant will be required to adopt and refine these designs i.e.Peer reviews. Align designs peer review recommendations to Rwandas green building requirements and make necessary provision for lightning mitigation. B. Detailed Design and Documentation Develop complete architectural, structural, civil, electrical, and mechanical design drawings and specifications. Ensure all designs meet applicable local building codes, environmental, health, and safety standards. Provide detailed bills of quantities (BoQ) and construction cost estimates. Incorporate value engineering and sustainability principles. C. Construction Support and Supervision Provide technical oversight during construction stages on demand basis. Certify works completed for payment approval. D. Handover and Close-Out Conduct final inspections and ensure compliance with design intent. Prepare as-built documentation. Provide post-construction review and performance evaluation reports. 4. Deliverables Peer Review Report detailing assessment of Ziplines concept design and layout, with recommendations aligned to Rwandas Green Building requirements and lightning protection standards. Approved Issued-for-Construction (IFC) Drawings complete architectural, structural, civil, mechanical, and electrical design packages ready for implementation. Regulatory Compliance Statement confirming conformity with all applicable Rwandan building codes, safety, and environmental standards. Material Selection and Supplier Recommendation Report technical advisory on suitable construction materials, including sustainability considerations and qualified local supplier options. Bill of Quantities (BoQ) and Cost Estimates comprehensive cost breakdowns incorporating value engineering and sustainability measures Site Supervision and Work Certification Reports periodic supervision documentation and certification of completed works for payment approval. As-Built Drawings and Handover Documentation finalized construction records reflecting actual site conditions at project completion. Post-Construction Performance Evaluation Report summary of project outcomes, operational efficiency, and compliance with green building objectives. 5. Duration and Timelines The anticipated duration of the consultancy and commencement date will be communicated at the point of contract signing. Proposers should however include a detailed work plan and timeline estimate showing milestones and expected deliverables in days. 6. Eligibility and Qualification Requirements Interested firms must demonstrate: Proven experience in multidisciplinary engineering and architectural consultancy (minimum of [3] similar projects in the past [5] years). Valid registration and practicing licenses from relevant professional bodies. Qualified in-house team of architects, structural/civil engineers, MEP engineers, and quantity surveyors. Demonstrated capacity to deliver within schedule and budget. Experience with industrial, logistics, and infrastructure projects is an added advantage. Foot print in more than one African country where Zipline operates is not mandatory but an added advantage. 7. Proposal Submission Requirements Proposals must include the following: Company ProfileBackground, legal registration, ownership, and organization structure. Technical Proposal Understanding of the assignment Proposed methodology and work plan Team composition and key staff CVs Relevant past project experience (with references) Insurance and warranties Financial Proposal Detailed cost breakdown by deliverable/stage Payment terms and validity period Supporting Documents Certificates of incorporation and licenses Tax compliance certificate Professional accreditation/registration certificates for the firm and its Engineers. References from at least three (3) previous clients 8. Evaluation Criteria Proposals will be evaluated based on the following criteria: Criteria Weight (%) Technical approach and methodology 25 Relevant experience and past performance 25 Qualifications and experience of key personnel 20 Financial proposal (cost competitiveness) 20 Project timelines and delivery plan 10 Only firms that meet the minimum technical score of [e.g., 70%] will have their financial proposals evaluated. 9. Submission Guidelines All proposals must be submitted electronically in PDF format to Email: africa.procurement@flyzipline.com , joseph.lumumba@flyzipline.com & alex.thal@flyzipline.com Subject: RFP End-to-End Design & Civil Works Consultancy Services (RFP Ref No.) Submission Deadline: 7th November 2025 Late submissions will not be accepted. 10. Clarifications and Enquiries All clarifications regarding this RFP must be submitted in writing to: Contact Person: Joseph Lumumba Email: joseph.lumumba@flyzipline.com Deadline for Clarifications: [ 2 days before submission deadline] Responses to all inquiries will be shared with all prospective bidders. 11. Confidentiality All information contained in this RFP and any subsequent communications shall be treated as confidential and used solely for the purpose of preparing the proposal. 12. Ziplines Rights Zipline reserves the right to: Accept or reject any proposal in whole or in part. Negotiate with one or more bidders. Cancel the RFP process at any stage without assigning reasons. Award the contract in whole or in part as deemed in the best interest of the company. [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.] Tender Link : https://www.jobinrwanda.com/job/request-proposal-rfp-service-provision-end-end-design-and-civil-works-consultancy-services