Checking The Wiring For Overheating And Overloading, Checking The Condition Of Cable Ends, Routing, Junction Boxes And Clamps, Checking The Absence Of Obstacles To The Movement Of The Door And The Connection Of Grounding To The Frame, Checking The State Of Environmental Protection, Checking The Neat And Correct Connection Of Internal Wiring, Checking The Condition And Correct Connection Of The Input Cables, Checking The Cleanliness Of Internal Parts, Checking Additional Grounding Connections, Checking That The Cables Are Insulated, Waterproof And Properly Routed, Checking The Correct And Solid Connection Of The Grounding Device, Checking The Doors For Mechanical Damage And Correct Opening And Closing, Measurement Of Grounding Resistance Of Cables And Wires, Power Cable Running From The Distribution Panel On The 5Th Floor In Building E To The Rooms, Power Cable From The Distribution Panel Located On The 4Th Floor In Building E To The Rooms, Power Cable From The Distribution Panel Located On The 3Rd Floor In Building E To The Rooms
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.