The Work Per Plot Mainly Consists Of: Carrying Out Minor Maintenance On Sidewalks And Roads; Construction Of Entrances And Thresholds; Repairing Damage (Including Vandalism) To Public Roads; Minor Sewer Maintenance; Installing Sewer Connections; The (Temporary) Installation Of Traffic Signs; Having Employees And Equipment Available And Deployed In The Event Of Emergencies; Occasionally Carrying Out Small Work Or Assignments On A Quotation Basis. Per Plot: Carrying Out And Preparing Partial Assignments, Approximately 250 Pieces (Annually); Applying (Smaller) Traffic Measures And Workplace Barriers; Deliveries Of Sand And Foundation Material Approximately 320 Tons; Supply Of Paving Material Approximately 10,000 Pieces; Supplying Sewer Pipes And Fittings Around 110, 125, 160, 200 And 250 Mm: Approximately 700 M And 1,500 Pieces Respectively; Transporting Released Materials (Soil, Rubble And Asphalt): Approximately 400 Tons; Deployment Of Employees, Total Approx. 5,000 Hours; Use Of Various Large Equipment.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.