Tenders Are Invited For Construction Of An External Elevator For An Accessible Environment To Dcc I - Third Polyclinic, Pernik, Iztok Quarter, Riga Street No. 3
Tenders Are Invited For Construction Of An External Elevator For An Accessible Environment To Dcc I - Third Polyclinic, Pernik, Iztok Quarter, Riga Street No. 3
Construction Of An External Elevator For An Accessible Environment To Dcc I - Third Polyclinic, Pernik, Iztok Quarter, Riga Street No. 3. The Subject Of The Public Procurement Is The Implementation Of Construction And Assembly Works For The Construction Of An External Elevator To Provide An Accessible Architectural Environment To The Building Of The Dcc I - Third Polyclinic, Pernik, Iztok Quarter, Riga Street #3, According To The Prepared, Agreed And Approved Investment Project. The Site Includes The Construction Of A Metal Elevator Structure With Three Stops At Elevations Of ±0.00 M, +3.240 M And +6.340 M, With A Total Height To The Upper Platform Of +10.614 M And A Built-Up Area Of 8.85 M². The Structure Is Made Of Steel Profiles S275jr, Mounted On A Reinforced Concrete Foundation Of Concrete C25/30 With Reinforcement B500b, Lined With Aluminum Composite Panels (Etalbond) On A Galvanized Substructure, With Thermal Insulation Of Mineral Wool With A Thickness Of Not Less Than 10 Cm And A Roof Of Metal Capitals With Two-Layer Waterproofing. Supply, Installation And Commissioning Of An Electric Lift With A Nominal Load Capacity Of At Least 450 Kg, With A Wheelchair Accessible Cabin, A Nominal Speed Of 1.0 M/S, Automatic Doors In Powder-Coated Steel, Full-Height Photocells, Led Lighting, A Mirror, A Handle And A Panel With Buttons With Braille Designations And An Audible Alarm Is Envisaged. The Lift Shall Be Equipped With Two-Way Voice Communication, Emergency Lighting And Automatic Return On Power Failure (Ard) Feature. The Power Supply Is Provided By An Existing Switchboard In The Building Through A Three-Phase Fuse And Cable Svt 5×6 Mm², And All Installations Should Be Completed With Non-Combustible Cables According To Bds Hd 60364. The Metal Parts And The Track Are Grounded With A Galvanized Bus Bar 40/4 Mm, And The Communication System Includes A Gsm/Ip Module For Emergency Connection. The Implementation Must Meet The Requirements Of Directive 2014/33/Eu (Elevator Directive) And The Standards Bds En 81-20, En 81-50, En 81-70 And En 81-28, As Well As The Provisions Of Zut, Ordinance No. 2/2003 On Commissioning Of Constructions, Ordinance Rd-02-20-2/2021 On Accessible Environment, The Ordinance On The Safe Operation And Technical Supervision Of Elevators And Other Applicable Regulations. In The Course Of Implementation, The Contractor Should Ensure Quality Control, Safe And Healthy Working Conditions According To Ordinance No. 2/2004, As Well As Compliance With Environmental Requirements In The Management Of Construction Waste. After Completion Of The Installation, Functional Tests And An Initial Technical Inspection Are Carried Out By Damtn, After Which The Object Is Put Into Operation And Handed Over To The Employer In A Ready-To-Use Form. A Detailed Description Of All Planned Activities Is Contained In The Technical Specification Attached To The Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.