Production And Delivery Of 28 Downpipes For Steam Generator #8 The Delivery Of The Materials For Making The Pipes Is Provided By The Contracting Authority. All Other Materials And Consumables Are The Responsibility Of The Contractor. All Should Be Marked With A Permanent Marker According To Their Designation On The Drawings. Painting With Anti-Corrosion Paint For Metal The Openings Of Each Pipe Must Be Closed With Plugs
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.