1.1 - Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps(20251011) Construction Shed For Type-I Sanitary Installation, Made Of Plywood Sheet Resin (Small Size Work, 2.3 - Construction Shed For Type-I Contractors Office, Internal Area 18, 15M2, Including Furniture (Small To Medium Size Work, Effective Up To 60 Men) - Standard Der-Mg(20251011):, 3.1 - Local Administration(20251011):, 10/24/2025, 4.1 - Mechanized Cleaning Of Vegetable Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), With Tracked Tractor. Af_03/2024(20251011):, 5.1 - Conventional Location Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024(20251011):, 6.1 - Manual Trench Excavation. Af_09/2024(20251011):, 6.2 - Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Adjustment Of The Natural Soil). Af_08/2020(20251011):, 6.3 - Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023(20251011):, 6.4 - Load, Maneuver And Unloading Soil And Granular Materials In A 14 M Dump Truck - Loading With Hydraulic Excavator (1.20 M Bucket / 155 Hp) And Free Unloading (Unit: M3). Af_07/2020(20251011):, 6.5 - Manual Regularization And Mechanized Compaction Of Land With Vibrating Plate, Excluding Deforestation, Destocking, Cleaning/Mowing Land(20251011):, 7.1 - Lean Concrete For Ballast, Ratio 1:4, 5:4, 5 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With 600 L Concrete Mixer. Af_05/2021(20251011):, 7.2 - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024(20251011):, 7.3 - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024(20251011):, 7.4 - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024(20251011):, 7.5 - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024(20251011):, 7.6 - Shaping And Unshaping Of Plasticized Plywood, Esp. 12Mm, Reuse (5X), Exclusive Shoring (20251011):, 7.7 - Concrete Fck = 25Mpa, Trace 1:2, 3:2, 7 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With 400 L Concrete Mixer. Af_05/2021(20251011):, 7.8 - Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023(20251011):, 8.1 - Reinforced Concrete Structure Pillar Or Beam Frame Embedded In Sealing Masonry Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022(20251011):, 8.2 - Reinforced Concrete Structure Pillar Or Beam Frame Embedded In Sealing Masonry Using Steel Ca-50 Of 8, 8.3 - Pillar Or Beam Frame Of Reinforced Concrete Structure Embedded In Sealing Masonry Using Steel Ca-50 Of 10, 8.4 - Shaping And Shaping Of Plasticized Plywood, 8.5 - Concrete Fck = 25Mpa, 8.6 - Unidirectional Pre-Molded Slab With Expanded Polystyrene Filling (Eps), 4Cm Capping, Overload 100Kg/M2, Total Height Of 11Cm And Maximum Free Space Of 3M, Including Structural Concrete, Machined Pumped With Fck Of 20Mpa, Exclusive Reinforced Mesh And Support (20251011):, 8.7 - Slab Frame Of Conventional Co Structure