Copper Radiator Repair Of Heating System Infection Furnaces 1200X1000 Mm, Copper Radiator Repair Of Heating System Asms Ahus 1000X1000 Mm, The Softening System Should Be Repaired 6.3 M3/H, It Is To Be Placed In A Reastrm To Be Abundant Pila Of Sand To A Reast On The Kitchen., In Order To Protect Equipment In The Boiler Room From Phase Loss, Installation Of 220-380 Phase Protection Systems In Total, The Control Board Of The Boilers Will Be Strengthened According To The Power Of The Pumps (Total Power 120 Kw), Provent 9400-9600-11400 M3/H G4 Filters Must Be Changed 60X60, Ahus F5-6-7-8-9 Filters Should Be Changed, The Special Oil Of The Oxygen Group Compressor Must Be Changed, The Air Filters Of The Oxygen Group Compressor Must Be Changed, Kompressor Fleet Fvk 7.5 Needs General Maintenance, Compressor Filo Fvk 7.5 Min-Max Pressure Relays Should Be Changed, Compressor Filo Fvk 7.5 Air Line Separator Filter, The Collector Of The Heating System Must Be Repaired And Replaced
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.