Railway Points – Material Delivery - Switch Renewal At Tannenbusch Mitte Parking Facility. Stadtwerke Bonn Verkehrs Gmbh (Swbv) Is Planning To Renew Switches 420, 421 And 422 And Track Connections Including Switch Drives In Bonn Tannenbusch-Mitte. As Part Of The Regular Inspections Of The Tracks And Switch Systems (Inspection Procedure), It Was Revealed That The Rail Track Of Switches 420, 421 And 422 Exhibited Fatigue Damage As Well As Protrusions And Partial Breakouts. In Addition, Biological Decay Was Detected On The Switch Sleepers. The Rails Have Already Been Welded On Several Times, So The Current Condition Does Not Allow Any Further Such Repair Work. The Aim Of The Construction Project Is The One-To-One Renewal Of The Switch Systems To Maintain Operations And Line Speed. The Tram Lines 16 And 63 Run In The Affected Section And Act As A Turning Point.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.